Pakistan

Ghazi-Barotha Hydropower Project — 1,450 MW Hydroelectric

Hydroelectric Renewable Verified

Ghazi-Barotha Hydropower Project is a 1,450 MW hydro power plant located in Pakistan. View location, capacity, and technical details.

Capacity
1,450 MW

Installed

Commissioned
2003

Year online

Owner
Water & Power Development Authority

Operator

Location
33.78, 72.26

Coordinates

Insights

#14
largest in Pakistan
#174
largest Hydroelectric worldwide
#1,335
largest worldwide
2003
19 yrs newer than avg
29
operated by Water & Power…
15
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
1,450 MW
Commissioned
2003
Status
Operational
Owner
Water & Power Development Authority
Country
Pakistan
Coordinates
33.780, 72.260
Wikipedia
Link

Carbon Footprint

Annual CO₂
121,939 t

tonnes / year

Lifetime CO₂
9,755,136 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

26,509
cars per year
16,259
homes per year
5,542,691
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

The Ghazi-Barotha Hydropower Project is a significant hydroelectric power facility located on the Indus River in Pakistan. With a total capacity of 1450 megawatts (MW), it serves as a crucial component of the country’s energy infrastructure. Owned and operated by the Water and Power Development Authority (WAPDA), the project plays a vital role in meeting the electricity demands of a growing population and industrial sector. Commissioned in 2003, the power plant utilizes the hydroelectric method of generating electricity, harnessing the kinetic energy of flowing water to produce power without depleting natural resources. This renewable energy source is particularly important for Pakistan, which faces challenges related to energy security and reliance on fossil fuels. The hydropower capacity of the Ghazi-Barotha project is derived from a diversion of water from the Indus River, which is then routed through a series of tunnels and channels to turbines that convert the water’s energy into electricity. The project features a run-of-the-river design, which minimizes the need for large reservoirs and reduces the environmental impact typically associated with traditional hydroelectric dams. The operational efficiency and sustainability of the Ghazi-Barotha project contribute to a more reliable electricity supply for the region, addressing critical energy shortages and supporting economic development. The environmental impact of the Ghazi-Barotha Hydropower Project is generally positive compared to fossil fuel-based power generation. As a renewable energy source, it produces no greenhouse gas emissions during operation, contributing to a reduction in air pollution and mitigating climate change effects. However, like many large-scale hydro projects, it does have some environmental considerations, including the alteration of local ecosystems and potential impacts on aquatic life due to changes in water flow. The project has implemented measures to monitor and manage these impacts, emphasizing the importance of balancing energy production with ecological conservation. Regionally, the Ghazi-Barotha Hydropower Project holds significant importance, not only for its contribution to the national grid but also for its influence on local economies. By providing a stable power supply, it supports agricultural activities, small businesses, and industrial operations, fostering economic growth in the surrounding areas. Additionally, the project enhances energy security for Pakistan, reducing dependence on imported fuels and contributing to energy independence. As the country continues to pursue sustainable energy solutions, the Ghazi-Barotha Hydropower Project stands as a testament to the potential of hydropower in addressing Pakistan’s energy challenges while promoting environmental sustainability.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.