Presa Chicoasen is a 2,400 MW hydro power plant located in Mexico. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 2,400 MW
- Commissioned
- 1980
- Status
- Operational
- Owner
- Comisión Federal de Electricidad
- Country
- Mexico
- Coordinates
- 16.943, -93.100
- Wikipedia
- Link
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Chicoasén Dam
Mexico · Hydroelectric
Manuel Moreno Torres (Chicoasén)
Mexico · Hydroelectric
Malpaso
Mexico · Hydroelectric
Malpaso Dam
Mexico · Hydroelectric
Presa Malpaso
Mexico · Hydroelectric
Presa La Angostura
Mexico · Hydroelectric
About this plant
Presa Chicoasén, located in the state of Chiapas, Mexico, is a prominent hydroelectric power station with a generating capacity of 2400 megawatts (MW). Owned and operated by the Comisión Federal de Electricidad (CFE), the plant plays a crucial role in Mexico’s energy sector, contributing significantly to the national grid and supporting the country’s growing electricity demands. Its establishment marked a significant advancement in harnessing renewable energy resources within the region, aligning with Mexico’s commitment to sustainable energy solutions.
As a hydroelectric facility, Presa Chicoasén utilizes the kinetic energy of flowing water to generate electricity. The plant operates by channeling water from the Grijalva River through a system of dams and turbines. This process involves storing water in a large reservoir, which is then released in a controlled manner to drive turbines that convert hydraulic energy into electrical energy. The efficiency of hydroelectric power lies in its ability to produce large amounts of energy with minimal operational costs once the infrastructure is established, making it a cost-effective alternative to fossil fuels.
The environmental impact of Presa Chicoasén is multifaceted. On one hand, hydroelectric power is generally considered a cleaner energy source, as it produces no direct greenhouse gas emissions during operation, thus contributing to a reduction in carbon footprint compared to fossil fuel-based power plants. However, the construction of the dam and reservoir has led to significant ecological changes in the surrounding area, including alterations to local ecosystems, displacement of communities, and changes in fish migration patterns. It is essential for the CFE to engage in ongoing environmental monitoring and mitigation strategies to address these impacts effectively.
Regionally, Presa Chicoasén holds significant importance as it aids in stabilizing the local and national electricity supply. The plant not only generates a substantial portion of the electricity consumed in the southern regions of Mexico but also supports the interconnection of various power grids across the country. This interconnectivity is vital for balancing supply and demand, especially during peak consumption periods. Furthermore, the presence of the power plant has fostered economic development in the region, creating jobs and stimulating local economies through the establishment of support services and infrastructure improvements.
In summary, Presa Chicoasén is a vital component of Mexico’s energy infrastructure, exemplifying the potential of hydroelectric power in meeting the nation’s energy needs while also presenting challenges that require careful management. Its role as a renewable energy source underscores Mexico’s commitment to a more sustainable energy future while balancing the ecological and social ramifications of large-scale energy projects.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.