Colombia

Ituango D — 2,400 MW Hydroelectric

Hydroelectric Renewable Verified

Ituango D is a 2,400 MW hydro power plant located in Colombia. View location, capacity, and technical details.

Capacity
2,400 MW

Installed

Commissioned
2011

Year online

Owner
EPM (Empresas Públicas de Medellín)

Operator

Location
7.13, -75.66

Coordinates

Insights

#1
largest in Colombia
#75
largest Hydroelectric worldwide
#553
largest worldwide
2011
27 yrs newer than avg
20
operated by EPM (Empresas Públicas…
31
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
2,400 MW
Commissioned
2011
Status
Operational
Owner
EPM (Empresas Públicas de Medellín)
Country
Colombia
Coordinates
7.134, -75.662
Wikipedia
Link

Estimated Carbon Footprint

Annual CO₂
201,830 t

tonnes / year

Lifetime CO₂
16,146,432 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

43,876
cars / year
26,911
homes / year
9,174,109
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Ituango D hydroelectric power plant, located in the Antioquia department of Colombia, stands as a significant contributor to the country’s energy landscape. Commissioned in 2011, the plant boasts a capacity of 2400 megawatts (MW), making it one of the largest hydroelectric facilities in Colombia and a critical component of the national grid. This facility plays a vital role in meeting the growing energy demands of the country while also promoting the use of renewable energy sources, thus aligning with global efforts to reduce reliance on fossil fuels.

As a hydroelectric power plant, Ituango D utilizes the kinetic energy of flowing water to generate electricity. The plant harnesses the power of the Cauca River, utilizing gravity and the flow of water to turn turbines that convert mechanical energy into electrical energy. This process is inherently sustainable, as it does not produce greenhouse gas emissions during operation, contributing positively to Colombia’s environmental goals. The hydroelectric approach allows for the generation of a significant amount of energy without depleting natural resources, making it a renewable and reliable power source.

However, the construction and operation of the Ituango D power plant have not been without environmental concerns. The project required substantial alterations to the local landscape and ecosystem, leading to potential impacts on biodiversity and water quality. These challenges have raised awareness about the balance needed between energy production and environmental conservation. Efforts have been made to mitigate adverse effects, including environmental monitoring and the implementation of measures to protect local wildlife and habitats.

Regionally, the Ituango D plant has significant importance for both the local economy and the broader Colombian energy sector. It not only provides a substantial amount of electricity to the national grid but also supports local jobs and economic development through construction, maintenance, and operational roles. Additionally, it enhances energy security in Colombia, particularly in a region that has historically faced challenges related to energy supply and infrastructure. The plant’s capacity helps stabilize the grid, especially during peak demand periods, thereby reducing the risk of blackouts and ensuring a steady supply of power for residential, commercial, and industrial use.

In summary, the Ituango D hydroelectric power plant is a cornerstone of Colombia’s energy infrastructure, providing substantial renewable energy capacity while also presenting environmental challenges that require careful management. Its role in fostering economic growth and enhancing energy security underscores its significance in the country’s pursuit of a sustainable energy future.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.