Jabori-Wasserkraftprojekt ist ein 11 MW Wasser Kraftwerk in Pakistan. Standort, Kapazität und technische Details anzeigen.
Installed
Year online
Operator
Koordinaten
Insights
Technische Details
- Brennstofftyp
- Wasserkraft
- Kapazität
- 11 MW
- Inbetriebgenommen
- —
- Status
- Operational
- Besitzer
- —
- Land
- Pakistan
- Wikipedia
- Link
CO₂-Fußabdruck
tonnes / year
over ~80 yrs
Geschätzte gCO2/kWh
Jährliche Emissionen entsprechen
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nahe gelegene Anlagen
About this plant
Jabori hydro power project is a 10.824 MW hydroelectric plant in Pakistan, with no specified operator.
Ranked #46 of 63 hydro plants in Pakistan, Jabori’s capacity accounts for 0.02% of the country’s total hydro capacity of 43,855 MW. The largest hydro plant in Pakistan is Bunji Dam at 7,100 MW, making Jabori over 656 times smaller.
Nearby plants include Bunji Dam (7,100 MW, Hydro), Ashihama nuclear power plant (2,700 MW, Nuclear), and Ladyzhyn power plant (1,800 MW, Coal). The facility is located in the Gilgit-Baltistan region, approximately 100 km from the nearest major city.
More Wasserkraft plants
Ein Fehler gefunden?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.