Salto Grande is a 102 MW hydro power plant located in Brazil. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 102 MW
- Commissioned
- 1956
- Status
- Operational
- Owner
- Companhia Energética de São Paulo (CESP)
- Country
- Brazil
- Coordinates
- -19.116, -42.719
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Aureliano Chaves (Antiga Ibirité)
Brazil · Natural Gas
Ibirité Power Plant
Brazil · Natural Gas
Baguari
Brazil · Hydroelectric
Guilman Amorim
Brazil · Hydroelectric
UHE Risoleta Neves (Candonga)
Brazil · Hydroelectric
Risoleta Neves (Antiga Candonga)
Brazil · Hydroelectric
About this plant
Salto Grande is a 102 MW hydroelectric power plant located in Brazil. Commissioned in 1956, it plays a role in the country’s extensive hydroelectric generation network.
Salto Grande ranks as the 150th largest hydro plant in Brazil. With a capacity of 102 MW, it represents 0.06% of Brazil’s total hydro capacity of 180,234 MW. Brazil has 720 hydro plants with a combined capacity of 180,234 MW. Compared to Itaipu Dam, the largest hydro plant at 14,000 MW, Salto Grande is approximately 0.73% the size.
Hydropower is a cornerstone of Brazil’s energy mix, providing over 60% of the country’s electricity. The vast river systems in Brazil facilitate the development of large-scale hydro projects. Salto Grande is located in the state of Minas Gerais, approximately 300 km from the city of Belo Horizonte.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.
SALTO GRANDE is a 945 MW hydro power plant located in Uruguay. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 945 MW
- Commissioned
- 1979
- Status
- Operational
- Owner
- UTE (Administración Nacional de Usinas y Trasmisiones Eléctricas)
- Country
- URY
- Coordinates
- -31.275, -57.938
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
The Salto Grande Hydroelectric Power Plant, located on the Uruguay River at the border between Uruguay and Argentina, is a significant energy facility with a generation capacity of 945 megawatts (MW). Commissioned in 1979, the power plant represents a crucial component of Uruguay’s energy sector, providing a substantial portion of the country’s electricity needs. Operated by the Salto Grande Binational Entity, a cooperative venture between Uruguay and Argentina, the facility showcases the potential of hydroelectric power as a clean and renewable energy source.
The hydroelectric power generation process at Salto Grande relies on the gravitational force of falling water to turn turbines, which convert kinetic energy into electrical energy. The plant utilizes the natural flow of the Uruguay River, where water is dammed to create a reservoir, allowing for the controlled release of water through turbines. This method not only generates power but also helps manage water resources in the region, balancing flood control with energy production. The plant’s capacity of 945 MW can produce approximately 5,000 GWh of electricity annually, significantly contributing to the national grid and ensuring energy security for Uruguay.
In terms of environmental impact, hydroelectric power is often regarded as one of the cleaner energy sources, as it produces negligible greenhouse gas emissions during operation. However, the construction of the Salto Grande facility did lead to some ecological changes, including alterations to local ecosystems and habitats due to the flooding of land to create the reservoir. Measures have been implemented to mitigate these impacts, including the establishment of environmental monitoring programs and efforts to preserve local wildlife.
Regionally, the Salto Grande Hydroelectric Power Plant plays a vital role not only in supplying energy to Uruguay but also in fostering collaboration between Uruguay and Argentina. The binational nature of the facility highlights the importance of cooperative resource management in the context of shared natural resources. The electricity produced at Salto Grande is crucial for supporting economic development in both countries, particularly in sectors like industry and agriculture, which rely heavily on stable and affordable energy supply.
Overall, the Salto Grande Hydroelectric Power Plant stands as a testament to the capabilities of hydroelectric energy in promoting sustainable development, energy independence, and regional cooperation. Its ongoing operation signifies Uruguay’s commitment to harnessing renewable resources while addressing the challenges of energy demand and environmental stewardship.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.