France

FESSENHEIM — 1,760 MW Nuclear

Nuclear Verified

FESSENHEIM is a 1,760 MW nuclear power plant located in France. View location, capacity, and technical details.

Capacity
1,760 MW

Installed

Commissioned
1977

Year online

Owner
Électricité de France (EDF)

Operator

Location
47.90, 7.56

Coordinates

Insights

#40
largest in France
#235
largest Nuclear worldwide
#1,045
largest worldwide
1977
11 yrs older than avg
41
operated by Électricité de France…
104
plants within 100 km

Technical Details

Fuel Type
Nuclear
Capacity
1,760 MW
Commissioned
1977
Status
Operational
Owner
Électricité de France (EDF)
Country
France
Coordinates
47.903, 7.563

Carbon Footprint

Annual CO₂
157,260 t

tonnes / year

Lifetime CO₂
7,862,976 t

over ~50 yrs

Intensity
12 g

Est. gCO2/kWh

Annual emissions equivalent to

34,187
cars per year
20,968
homes per year
7,148,160
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The Fessenheim Nuclear Power Plant, located in the Alsace region of France, is a significant facility in the country’s energy sector, boasting a total capacity of 1,760 megawatts (MW). Commissioned in 1977, Fessenheim consists of two pressurized water reactors (PWRs) that utilize enriched uranium as fuel, a common choice for nuclear power plants due to its efficiency and high energy output. Each reactor has a capacity of 880 MW, contributing to France’s status as one of the world’s leading producers of nuclear energy. In fact, nuclear power accounts for approximately 70% of the electricity generated in France, making it a linchpin in the nation’s energy strategy aimed at reducing dependence on fossil fuels and minimizing greenhouse gas emissions.

The fuel type used at Fessenheim, enriched uranium, undergoes a process of enrichment to increase the concentration of the fissile isotope uranium-235. This allows for a more efficient nuclear fission reaction, which releases a substantial amount of energy used to heat water, generating steam that drives turbines to produce electricity. The reactors at Fessenheim are designed with multiple safety systems to protect against potential accidents, reflecting France’s stringent nuclear safety regulations.

Environmental considerations surrounding the Fessenheim Nuclear Power Plant are multifaceted. On one hand, the plant produces electricity with minimal carbon emissions compared to fossil fuel power generation, contributing to climate change mitigation efforts. However, the facility has faced scrutiny regarding its environmental impact, particularly in relation to its cooling water intake from the nearby Rhine River and the management of nuclear waste. The plant’s operation has raised concerns about potential thermal pollution and its effects on local aquatic ecosystems, as well as the long-term challenges associated with radioactive waste disposal.

Regionally, Fessenheim has played a crucial role not only in meeting the energy needs of Alsace and the broader French grid but also in providing employment and economic benefits to the surrounding communities. The plant has been a significant source of jobs, both directly and indirectly, contributing to local economies. However, the plant’s future has been a topic of debate, especially with the French government’s commitment to reducing the share of nuclear power in the energy mix and transitioning towards renewable sources. In 2020, the Fessenheim facility was officially shut down, marking the end of its operational life, but its legacy continues to shape discussions around energy policy and environmental stewardship in France.

Overall, the Fessenheim Nuclear Power Plant serves as a noteworthy example of the complexities involved in nuclear energy production, balancing energy demands, environmental responsibilities, and regional economic impacts in the context of France’s ambitious energy goals.