Türkiye

Karacaören I HES — 32 MW Hydroelectric

Hydroelectric Renewable Verified

Karacaören I HES is a 32 MW hydro power plant located in Turkey. View location, capacity, and technical details.

Capacity
32 MW

Installed

Commissioned
2001

Year online

Owner
Gama Enerji

Operator

Location
37.37, 30.83

Coordinates

Insights

#202
largest in %s
#3,742
largest %s worldwide
#16,178
largest worldwide
2001
%d yrs newer than avg
2
operated by %s
11
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
32 MW
Commissioned
2001
Status
Operational
Owner
Gama Enerji
Country
Türkiye
Coordinates
37.367, 30.831

Estimated Carbon Footprint

Annual CO₂
2,691 t

tonnes / year

Lifetime CO₂
215,286 t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

585
cars / year
359
homes / year
122,321
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Karacaören I HES is a 32 MW hydro power plant in Turkey, operated by Gama Enerji since its commissioning year is not specified.

Ranked #96 of 139 hydro plants in Turkey. Its 32 MW represents 0.14% of Turkey’s total hydro capacity of 22,862 MW. The largest hydro plant in Turkey is Atatürk Dam at 2,400 MW, making this facility 75 times smaller.

Nearby plants within 50 km include Aksa Antalya Doğalgaz Santrali (1150 MW, Gas), Karacaören-2 Dam (46.4 MW, Hydro), and Kovada I HES (8.25 MW, Hydro). The facility is located in Isparta Province, approximately 50 km from the city of Isparta.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.