TARAPUR is a 1,400 MW nuclear power plant located in India. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Nuclear
- Capacity
- 1,400 MW
- Commissioned
- 1996
- Status
- Operational
- Owner
- Tata Power Company Limited
- Country
- India
- Coordinates
- 19.829, 72.662
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Stations
Tarapur Atomic Power Station
India · Nuclear
NASIK TPP PH 1
India · Coal
Kakrapar Atomic Power Station
India · Nuclear
Ukai Thermal Power Station
India · Coal
UKAI_Coal
India · Coal
Trombay Thermal Power Station
India · Natural Gas
About this plant
The Tarapur Nuclear Power Plant, located in Maharashtra, India, is a significant facility in the country’s energy landscape. Commissioned in 1996, this nuclear power plant boasts a total capacity of 1,400 megawatts (MW). It plays a crucial role in India’s efforts to diversify its energy sources, reduce dependency on fossil fuels, and contribute to the nation’s energy security. As one of the oldest nuclear power plants in India, Tarapur has been instrumental in the development of the country’s nuclear energy program and has established itself as a key player in meeting the growing electricity demand in the region.
The Tarapur Nuclear Power Plant operates using nuclear fuel, specifically enriched uranium, which undergoes a fission reaction to generate heat. This heat is used to produce steam that drives turbines, ultimately generating electricity. The facility is equipped with pressurized water reactors (PWR), which are designed to maintain high efficiency and safety standards. The use of nuclear energy, particularly from enriched uranium, allows the plant to produce a large amount of electricity with a relatively small amount of fuel compared to conventional fossil fuel power plants. This efficiency contributes to lower operational costs and a reduction in greenhouse gas emissions, aligning with global efforts to combat climate change.
In terms of environmental impact, the Tarapur Nuclear Power Plant has both positive and negative aspects. On the one hand, it produces electricity with minimal air pollutants and greenhouse gas emissions, making it a cleaner alternative to coal or gas-fired power plants. This is particularly important for India, where air quality and pollution levels are critical public health issues. On the other hand, the management of nuclear waste remains a significant challenge. The plant is responsible for safely storing and managing spent nuclear fuel, which poses long-term environmental and safety risks. The potential for nuclear accidents, while statistically low, also raises concerns about the safety of local populations and ecosystems.
Regionally, the Tarapur Nuclear Power Plant holds considerable significance. It not only contributes to the electricity supply of Maharashtra but also supports the economic development of surrounding areas by providing a stable power source for industries and residential consumers. The plant’s presence stimulates local job creation and fosters technological advancements in the region. Additionally, it serves as a model for future nuclear projects in India, which aims to expand its nuclear power generation capacity to meet the increasing energy needs of its population.
In conclusion, the Tarapur Nuclear Power Plant is a pivotal component of India’s energy sector. Its operational capacity, reliance on nuclear fuel, and the balance of environmental impacts underscore its importance in the country’s pursuit of sustainable energy solutions. As India continues to develop its nuclear infrastructure, Tarapur will likely remain a cornerstone of its energy policy, shaping the future of energy production in the nation.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.