United Arab Emirates

Jebel Ali “L” – Ph ll — 1,393 MW Natural Gas

Natural Gas Verified

Jebel Ali “L” – Ph ll is a 1,393 MW gas power plant located in United Arab Emirates. View location, capacity, and technical details.

Capacity
1,393 MW

Installed

Commissioned
2007

Year online

Owner
DEWA

Operator

Location
25.05, 55.11

Coordinates

Insights

#26
largest in United Arab Emirates
#390
largest Natural Gas worldwide
#1,440
largest worldwide
2007
8 yrs newer than avg
12
operated by DEWA
54
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
1,393 MW
Commissioned
2007
Status
Operational
Owner
DEWA
Country
United Arab Emirates
Coordinates
25.051, 55.111

Estimated Carbon Footprint

Annual CO₂
2,690,691 t

tonnes / year

Lifetime CO₂
80,720,728 t

over ~30 yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

584,933
cars / year
358,759
homes / year
122,304,134
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Jebel Ali ‘L’ Power Plant, located in the United Arab Emirates, is a significant asset in the country’s energy infrastructure, with a generating capacity of 1,393 megawatts (MW). Commissioned in 2007 and owned by the Dubai Electricity and Water Authority (DEWA), this gas-fired power plant plays a crucial role in supporting the growing energy demands of Dubai and the wider UAE. The facility is an integral part of DEWA’s efforts to ensure a reliable and sustainable power supply in the region, contributing to the energy security of one of the fastest-growing cities in the world.

The Jebel Ali ‘L’ Power Plant utilizes natural gas as its primary fuel source, which is a cleaner alternative to oil and coal. Natural gas combustion results in lower emissions of carbon dioxide (CO2) and other harmful pollutants, making it a preferable choice for modern power generation. The plant employs advanced technology and efficient turbine systems to optimize fuel consumption and minimize waste. This focus on efficiency not only contributes to the reduction of operational costs but also helps in meeting the UAE’s commitment to lowering greenhouse gas emissions and transitioning towards a more sustainable energy future.

In terms of environmental impact, the Jebel Ali ‘L’ Power Plant has been designed with consideration for ecological sustainability. The use of natural gas significantly reduces the emissions associated with traditional fossil fuels. Moreover, DEWA has implemented measures to minimize the plant’s environmental footprint, including state-of-the-art emissions control systems that meet stringent regulatory standards. These initiatives align with the UAE’s broader environmental goals, which emphasize the importance of reducing reliance on fossil fuels and promoting renewable energy sources.

Regionally, the Jebel Ali ‘L’ Power Plant holds strategic significance. Its substantial output supports not only the local demand for electricity but also contributes to the overall energy grid in the UAE. As a part of the country’s diversification strategy, the plant aids in stabilizing the energy supply, which is particularly vital for economic growth and the continuous development of infrastructure. The facility also plays a role in fostering energy cooperation within the Gulf Cooperation Council (GCC) region, where shared resources and joint initiatives are increasingly important to address the collective energy needs of the member states.

In conclusion, the Jebel Ali ‘L’ Power Plant is a key component of the United Arab Emirates’ energy landscape. With its significant capacity, reliance on natural gas, and commitment to environmental sustainability, it exemplifies the UAE’s approach to modern energy production. As the country continues to navigate the challenges of energy demand and environmental stewardship, the role of facilities like Jebel Ali ‘L’ will remain vital to achieving a balanced and sustainable energy future.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.