Egypt

New Administrative Capital Power Station — 4,800 MW Natural Gas

Natural Gas Verified

New Administrative Capital Power Station is a 4,800 MW gas power plant located in Egypt. View location, capacity, and technical details.

Capacity
4,800 MW

Installed

Commissioned
2017

Year online

Owner
Egyptian Electricity Holding Company (EEHC)

Operator

Location
29.91, 31.76

Coordinates

Insights

#1
largest in %s
#20
largest %s worldwide
#94
largest worldwide
2017
%d yrs newer than avg
4
operated by %s
51
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
4,800 MW
Commissioned
2017
Status
Operational
Owner
Egyptian Electricity Holding Company (EEHC)
Country
Egypt
Coordinates
29.909, 31.755
Wikipedia
Link

Estimated Carbon Footprint

Annual CO₂
9.3M t

tonnes / year

Lifetime CO₂
278.1M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

2M
cars / year
1.2M
homes / year
421.4M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The New Administrative Capital Power Plant, known in Arabic as محطة كهرباء العاصمة الإدارية الجديدة, is a significant energy facility located in Egypt, with a total capacity of 4,800 megawatts (MW). Commissioned in 2017 and operated by the Egyptian Electricity Holding Company (EEHC), this gas-fired power plant plays a crucial role in meeting the growing energy demands of Egypt, particularly as the nation continues to expand its infrastructure and urban development. The power plant is strategically located to support the New Administrative Capital project, which aims to alleviate congestion in Cairo and promote economic growth in the region.

The New Administrative Capital Power Plant primarily utilizes natural gas as its fuel source. Natural gas is considered a cleaner alternative to other fossil fuels, such as coal and oil, resulting in lower greenhouse gas emissions and reduced air pollutants. This aligns with Egypt’s commitment to enhancing its energy efficiency and reducing its carbon footprint. The plant incorporates advanced technology designed to optimize the combustion process, thereby maximizing energy output while minimizing environmental impact. The use of state-of-the-art turbines and generators ensures high efficiency rates, allowing the power plant to produce electricity with less fuel consumption compared to older generation facilities.

In terms of environmental impact, the New Administrative Capital Power Plant represents a step forward in Egypt’s energy strategy. By relying on natural gas, the facility contributes to lowering sulfur dioxide (SO2) and nitrogen oxides (NOx) emissions, which are major contributors to air pollution. Additionally, the plant is equipped with systems to manage waste and minimize water usage, thereby reducing its overall ecological footprint. However, it is essential to continue monitoring the long-term effects of natural gas extraction and transportation on local ecosystems and communities.

The regional significance of the New Administrative Capital Power Plant extends beyond its immediate vicinity. As Egypt seeks to diversify its energy sources and reduce dependence on imported fuels, this power plant is a vital component of the national grid. It not only supports the energy requirements of the New Administrative Capital but also contributes to the stability and reliability of electricity supply across the country. The integration of such large-scale power generation facilities is essential for fostering economic development, attracting investment, and improving the quality of life for citizens.

Overall, the New Administrative Capital Power Plant stands as a testament to Egypt’s efforts to enhance its energy infrastructure and promote sustainable development. By leveraging modern technology and cleaner fuel sources, the facility plays an integral role in shaping the future of the country’s energy sector and supporting its ambitious growth plans.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.