Brazil

Antônio Brennand (Antiga Alto Jauru) — 22 MW Hydroelectric

Hydroelectric Renewable Verified

Antônio Brennand (Antiga Alto Jauru) is a 22 MW hydro power plant located in Brazil. View location, capacity, and technical details.

Capacity
22 MW

Installed

Commissioned
2002

Year online

Owner
Eletrobras

Operator

Location
-15.05, -58.75

Coordinates

Insights

#901
largest in %s
#4,345
largest %s worldwide
#18,675
largest worldwide
2002
%d yrs newer than avg
63
operated by %s
15
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
22 MW
Commissioned
2002
Status
Operational
Owner
Eletrobras
Country
Brazil
Coordinates
-15.047, -58.752

Estimated Carbon Footprint

Annual CO₂
1,847 t

tonnes / year

Lifetime CO₂
147,740 t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

401
cars / year
246
homes / year
83,943
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Antônio Brennand (Antiga Alto Jauru) is a 21.96 MW hydro power plant in Brazil, commissioned in 2002.

Ranked #288 of 720 hydro plants in Brazil. Its 21.96 MW represents 0.01% of Brazil’s 180,234 MW total hydro capacity. The largest hydro plant in Brazil is Itaipu Dam at 14,000 MW, making Antônio Brennand 637.7 times smaller.

Nearby plants within 50 km include Guaporé (124.2 MW, Hydro), UHE Jauru (122 MW, Hydro), and Jauru (121.5 MW, Hydro). The facility is located in the Mato Grosso region, approximately 200 km from Cuiabá.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.