Mexico

Central Termoelectrica Presidente Juarez — 1,303 MW Natural Gas

Natural Gas Verified

Central Termoelectrica Presidente Juarez is a 1,303 MW gas power plant located in Mexico. View location, capacity, and technical details.

Capacity
1,303 MW

Installed

Commissioned
1963

Year online

Owner
Comisión Federal de Electricidad

Operator

Location
32.37, -117.07

Coordinates

Insights

#24
largest in Mexico
#452
largest Natural Gas worldwide
#1,643
largest worldwide
1963
36 yrs older than avg
86
operated by Comisión Federal de…
74
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
1,303 MW
Commissioned
1963
Status
Operational
Owner
Comisión Federal de Electricidad
Country
Mexico
Coordinates
32.369, -117.069

Estimated Carbon Footprint

Annual CO₂
2,516,849 t

tonnes / year

Lifetime CO₂
75,505,462 t

over ~30 yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

547,141
cars / year
335,580
homes / year
114,402,215
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Central Termoeléctrica Presidente Juárez is a significant power plant located in Mexico, with a total installed capacity of 1,303 megawatts (MW). Owned and operated by the Comisión Federal de Electricidad (CFE), the plant was commissioned in 1963 and has played a crucial role in the country’s energy landscape for several decades. As a gas-fired power plant, it primarily utilizes natural gas as its fuel source, which is known for its relatively lower emissions compared to other fossil fuels such as coal or oil. This characteristic makes the plant a vital component in Mexico’s efforts to transition to cleaner energy sources while still meeting the increasing demand for electricity in a growing economy.

The Central Termoeléctrica Presidente Juárez contributes significantly to the national grid, providing a reliable supply of electricity to various regions in Mexico. Its strategic importance lies in its ability to generate power efficiently, especially during peak demand periods. Natural gas, as a fuel type, offers advantages such as high efficiency and the ability to quickly ramp up production, which is essential for maintaining grid stability. Additionally, the infrastructure supporting the plant facilitates the import of natural gas from neighboring countries, enhancing energy security and diversification of supply.

In terms of environmental impact, while natural gas is cleaner than coal, the operation of the Central Termoeléctrica Presidente Juárez is not without its challenges. The combustion of natural gas still results in greenhouse gas emissions, albeit at lower levels. The plant’s operation must comply with environmental regulations, which are designed to minimize air pollution and other negative impacts on the surrounding ecosystem. The CFE has undertaken efforts to incorporate more sustainable practices, aiming to reduce the carbon footprint of its operations as part of Mexico’s broader commitment to climate change mitigation.

Regionally, the Central Termoeléctrica Presidente Juárez is a critical asset for the local economy and energy infrastructure. It provides jobs and supports various ancillary industries, contributing to the socioeconomic development of the area. The power generated by the plant is essential not only for residential use but also for supporting industries and commercial activities, thereby fostering regional economic growth.

Overall, the Central Termoeléctrica Presidente Juárez stands as a testament to Mexico’s energy strategies, balancing the need for reliable electricity generation with the goals of environmental stewardship and economic development. As the country continues to evolve its energy policies and invest in renewable resources, the role of such thermal power plants will be increasingly evaluated in the context of a sustainable energy future.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.