United Arab Emirates

Phase 1 — 13 MW Solar

Solar Renewable Verified

Phase 1 is a 13 MW solar power plant located in United Arab Emirates. View location, capacity, and technical details.

Capacity
13 MW

Installed

Commissioned
2021

Year online

Owner
Dubai Electricity & Water Authority (DEWA)

Operator

Location
24.77, 55.37

Coordinates

Insights

#62
largest in %s
#3,261
largest %s worldwide
#22,127
largest worldwide
2021
%d yrs newer than avg
1
operated by %s
53
plants within 100 km

Technical Details

Fuel Type
Solar
Capacity
13 MW
Commissioned
2021
Status
Operational
Owner
Dubai Electricity & Water Authority (DEWA)
Country
United Arab Emirates
Coordinates
24.766, 55.373

Estimated Carbon Footprint

Annual CO₂
840 t

tonnes / year

Lifetime CO₂
25,213 t

over ~%d yrs

Intensity
41 g

gCO₂ per kWh

Annual emissions equal to

183
cars / year
112
homes / year
38,202
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Phase 1 is a 13 MW solar power plant in the United Arab Emirates, operated by Dubai Electricity & Water Authority (DEWA) since its commissioning.

Ranked #13 of 22 solar plants in the United Arab Emirates, this facility contributes 0.17% of the country’s total solar capacity of 7,825 MW. The largest solar plant in the United Arab Emirates is مجمع محمد بن راشد آل مكتوم للطاقة الشمسية at 2,427 MW, making Phase 1 186 times smaller.

Nearby plants include محطة كهرباء جبل علي (Gas, 9,547 MW), Jebel Ali Power and Desalination Plant (Gas, 8,694.1 MW), and Emirates Global Aluminium Jebel Ali power plant (Gas, 2,950 MW). The facility is located in Dubai, approximately 35 km southwest of the city center.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.