Saudi Arabia

SHAIBA — 1,191 MW Oil

Oil Verified

SHAIBA is a 1,191 MW oil power plant located in Saudi Arabia. View location, capacity, and technical details.

Capacity
1,191 MW

Installed

Commissioned
2009

Year online

Owner
Shuaibah Water and Electricity Company

Operator

Location
20.63, 39.55

Coordinates

Insights

#42
largest in %s
#70
largest %s worldwide
#2,078
largest worldwide
2009
%d yrs newer than avg
1
operated by %s
15
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
1,191 MW
Commissioned
2009
Status
Operational
Owner
Shuaibah Water and Electricity Company
Country
Saudi Arabia
Coordinates
20.630, 39.552

Estimated Carbon Footprint

Annual CO₂
2,711,938 t

tonnes / year

Lifetime CO₂
81,358,150 t

over ~%d yrs

Intensity
650 g

gCO₂ per kWh

Annual emissions equal to

589,552
cars / year
361,592
homes / year
123,269,924
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The SHAIBA Power Plant, located in Saudi Arabia, is a significant facility with a generation capacity of approximately 1190.7 megawatts (MW). Commissioned in 2009, it is owned and operated by the Shuaibah Water and Electricity Company, which plays a crucial role in the region’s energy supply. This power plant primarily utilizes oil as its fuel source, reflecting Saudi Arabia’s vast reserves and established infrastructure for oil production and distribution.

In the context of Saudi Arabia’s energy sector, SHAIBA serves as a vital contributor to both electricity generation and water desalination processes. The facility is strategically important in meeting the growing demand for energy driven by the country’s rapid economic development and population growth. The SHAIBA Power Plant not only provides power to residential and industrial sectors but also supports the water supply through its integration with desalination processes, essential for a country characterized by arid climate conditions and limited freshwater resources.

The use of oil as the primary fuel type has significant technical implications. Oil-fired power plants like SHAIBA convert chemical energy stored in oil into electricity through combustion processes. This method of generation is relatively straightforward and allows for rapid response to fluctuations in electricity demand, which is essential for maintaining grid stability. However, relying on oil also raises concerns regarding fuel volatility and price fluctuations, given the global oil market’s dynamics.

The environmental impact of SHAIBA is a topic of ongoing discussion. While oil-fired power plants contribute to economic growth, they also produce greenhouse gas emissions and other pollutants that can impact air quality. Saudi Arabia has been working to address these concerns by investing in cleaner technologies and diversifying its energy mix, including renewable sources. Nevertheless, the immediate environmental footprint of SHAIBA must be balanced against the urgent energy needs of the country.

Regionally, the SHAIBA Power Plant holds significance as part of Saudi Arabia’s broader energy strategy. It exemplifies the country’s efforts to leverage its natural resources for energy generation while also supporting infrastructure development in the region. As part of the Vision 2030 initiative, which aims to diversify the economy and reduce dependence on oil, facilities like SHAIBA are being evaluated for their long-term sustainability and integration with renewable energy sources.

In summary, the SHAIBA Power Plant is a critical asset in Saudi Arabia’s energy landscape, contributing significantly to electricity generation and water desalination. While its reliance on oil poses environmental challenges, the facility plays a pivotal role in meeting the energy demands of a rapidly developing nation, highlighting the complexities of balancing economic growth with environmental stewardship.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.