United States

Geysers Unit 5-20 — 1,163 MW Geothermal

Geothermal Renewable Verified

Geysers Unit 5-20 is a 1,163 MW geothermal power plant located in United States of America. View location, capacity, and technical details.

Capacity
1,163 MW

Installed

Commissioned
1979

Year online

Owner
Geysers Power Co LLC

Operator

Location
38.78, -122.75

Coordinates

Insights

#319
largest in United States of America
#1
largest Geothermal worldwide
#2,125
largest worldwide
1979
20 yrs older than avg
4
operated by Geysers Power Co…
74
plants within 100 km

Technical Details

Fuel Type
Geothermal
Capacity
1,163 MW
Commissioned
1979
Status
Operational
Owner
Geysers Power Co LLC
Country
United States
Coordinates
38.777, -122.745

Estimated Carbon Footprint

Annual CO₂
309,712 t

tonnes / year

Lifetime CO₂
9,291,347 t

over ~30 yrs

Intensity
38 g

gCO₂ per kWh

Annual emissions equal to

67,329
cars / year
41,295
homes / year
14,077,798
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Geysers Unit 5-20 is a significant geothermal power plant located in California, USA, with a combined capacity of 1,163 megawatts (MW). Commissioned in 1979, this facility is part of the larger Geysers complex, which is renowned as the largest geothermal power station in the world. Owned by Geysers Power Co LLC, the plant plays a crucial role in supplying clean and renewable energy to the region and contributes to the broader energy sector of the United States.

Geothermal energy, the fuel type utilized by Geysers Unit 5-20, is derived from the Earth’s internal heat. This heat can be harnessed to produce steam, which drives turbines to generate electricity. The geothermal resources at Geysers originate from volcanic activity in the region, where the Earth’s crust is thinner, allowing heat to escape more easily. Wells are drilled deep into the Earth to access steam and hot water, which are then used in the power generation process. This renewable energy source is characterized by its reliability and potential for baseload power generation, offering a consistent supply of electricity unlike some other renewable sources that are dependent on weather conditions.

The environmental impact of Geysers Unit 5-20 is relatively low compared to fossil fuel-based power plants. Geothermal energy production emits significantly fewer greenhouse gases and pollutants, making it a more sustainable option for energy generation. The facility has been designed to minimize emissions and reduce the ecological footprint. However, there are some environmental considerations, such as the management of wastewater and the potential for induced seismicity, which refers to minor earthquakes that may occur due to changes in underground pressure from geothermal operations. Nonetheless, regulatory measures and technological advancements have helped mitigate these risks.

Regionally, Geysers Unit 5-20 serves as a vital asset to California’s energy grid, contributing significantly to the state’s renewable energy goals. As California continues to push for a transition to cleaner energy sources, geothermal power remains an essential component of its energy mix. The plant not only helps reduce reliance on fossil fuels but also supports local economies through job creation in construction, maintenance, and operations. Furthermore, it enhances energy security by providing a stable and continuous source of electricity that can complement intermittent resources such as solar and wind.

Overall, Geysers Unit 5-20 stands as a testament to the potential of geothermal energy in addressing the challenges of energy production while promoting environmental sustainability and economic growth. Its long-standing operational history and significant capacity make it a cornerstone of California’s renewable energy landscape and a model for future geothermal developments across the United States.

More Geothermal plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.