PLTGU Tambak Lorok is a 1,034 MW gas power plant located in Indonesia. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Natural Gas
- Capacity
- 1,034 MW
- Commissioned
- 2014
- Status
- Operational
- Owner
- PLN – Indonesia Power
- Country
- Indonesia
- Coordinates
- -6.951, 110.434
Estimated Carbon Footprint
tonnes / year
over ~30 yrs
gCO₂ per kWh
Annual emissions equal to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Stations
PLTU Tanjung Jati B
Indonesia · Coal
Tanjung Jati Power Plant
Indonesia · Natural Gas
Cilacap Power Plant
Indonesia · Natural Gas
PLTU Cilacap
Indonesia · Coal
Tambak Lorok Power Plant
Indonesia · Natural Gas
PLTU Tanjung Jati B - expansion
Indonesia · Coal
About this plant
The PLTGU Tambak Lorok is a significant gas-fired power plant located in Indonesia, with a total installed capacity of 1,034 megawatts (MW). Owned and operated by PLN – Indonesia Power, this facility plays a critical role in the country’s energy sector, contributing to the reliability and sustainability of the national electricity supply. As Indonesia continues to develop its infrastructure and industrial capabilities, the demand for stable and efficient energy sources has become increasingly important. PLTGU Tambak Lorok helps to meet this demand by providing a substantial portion of the electricity required to support both residential and industrial consumers in the region.
The plant utilizes natural gas as its primary fuel source, a choice that aligns with global trends towards cleaner energy production. Natural gas is often seen as a transitional fuel, as it emits lower levels of carbon dioxide (CO2) compared to coal and oil when combusted. The use of gas also results in fewer pollutants such as sulfur dioxide (SO2) and nitrogen oxides (NOx), making it a more environmentally friendly option. This is particularly significant in a country like Indonesia, which has been grappling with air quality issues and the pressing need to reduce greenhouse gas emissions in line with international climate commitments.
Technically, the PLTGU Tambak Lorok employs advanced combined cycle technology, which enhances its efficiency by utilizing both gas and steam turbines. In this setup, the gas turbines generate electricity and produce hot exhaust gases, which are then directed to a steam turbine to generate additional power. This dual-use of energy not only maximizes fuel efficiency but also minimizes waste, contributing to a more sustainable power generation process. The integration of modern technologies in the plant’s design ensures that it operates at optimal performance levels, thus supporting Indonesia’s energy needs effectively.
In terms of regional significance, the PLTGU Tambak Lorok serves as a backbone for the electrical grid in Central Java, helping to stabilize supply in a region characterized by fluctuating energy demand. The plant is strategically positioned to support not only local consumers but also to feed electricity into the broader grid, facilitating energy distribution across other provinces. This interconnectedness is vital for enhancing energy security and resilience against disruptions.
Furthermore, the establishment of PLTGU Tambak Lorok has broader economic implications, as it fosters job creation and stimulates local economies through construction, maintenance, and operational activities. As Indonesia aims to transition towards a more sustainable energy future, facilities like PLTGU Tambak Lorok represent a crucial step in balancing economic growth with environmental stewardship, ultimately contributing to the nation’s overarching energy goals.