Czechia

Elektrárna Mělník — 960 MW Coal

Coal Verified

Elektrárna Mělník is a 960 MW coal power plant located in Czech Republic. View location, capacity, and technical details.

Capacity
960 MW

Installed

Commissioned
1975

Year online

Owner
ČEZ

Operator

Location
50.41, 14.41

Coordinates

Insights

#9
largest in %s
#952
largest %s worldwide
#2,564
largest worldwide
1975
%d yrs older than avg
8
operated by %s
184
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
960 MW
Commissioned
1975
Status
Operational
Owner
ČEZ
Country
Czechia
Coordinates
50.413, 14.412

Estimated Carbon Footprint

Annual CO₂
3.8M t

tonnes / year

Lifetime CO₂
151.7M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

824,506
cars / year
505,697
homes / year
172.4M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Elektrárna Mělník is a significant coal-fired power plant located in the Czech Republic, with a total installed capacity of 960 megawatts (MW). Owned by ČEZ, the largest energy company in Central Europe, this facility plays a crucial role in the country’s energy sector by providing a reliable source of electricity to meet the demands of both residential and industrial consumers. The power plant is strategically positioned near the Elbe River, allowing for efficient transportation of coal and facilitating operations.

As a coal-fired power plant, Elektrárna Mělník utilizes coal as its primary fuel source. Coal is a fossil fuel that has been historically significant in power generation due to its abundance and relatively low cost compared to other energy sources. The combustion of coal in power plants produces steam that drives turbines, generating electricity. However, this fuel type also presents challenges, particularly concerning carbon emissions and other pollutants. In response, Elektrárna Mělník has implemented various technologies to enhance efficiency and minimize its environmental impact. This includes the installation of emission control systems designed to reduce sulfur dioxide (SO2), nitrogen oxides (NOx), and particulate matter released into the atmosphere.

The environmental impact of coal-fired power generation remains a critical concern in the Czech Republic, where coal has been a dominant energy source for decades. While Elektrárna Mělník complies with established environmental regulations, the plant is still subject to scrutiny regarding its contributions to air pollution and greenhouse gas emissions. The Czech government and the European Union are increasingly pushing for a transition to cleaner energy sources, leading to significant discussions about the future role of coal in the national energy mix. As such, Elektrárna Mělník must navigate a challenging landscape of regulatory pressures and public opinion while balancing energy needs and environmental responsibilities.

Regionally, Elektrárna Mělník serves as a vital component of the Czech energy infrastructure, supporting not only local economies but also the broader national grid. The plant’s output contributes to energy security, particularly during peak demand periods when alternative sources may fall short. As the country seeks to diversify its energy portfolio and incorporate more renewable energy sources, the role of existing coal plants like Elektrárna Mělník is being reevaluated. This transition is essential for aligning with global climate goals while ensuring that energy supply remains stable and affordable for consumers.

In conclusion, Elektrárna Mělník stands as a prominent player in the Czech Republic’s energy landscape, reflecting the complexities of balancing economic needs with environmental stewardship. As the nation moves towards a sustainable energy future, the power plant’s operations, technology, and environmental strategies will be pivotal in shaping the way forward.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.