Bangladesh

Meghnaghat CCPP — 855 MW Natural Gas

Natural Gas Verified

Meghnaghat CCPP is a 855 MW gas power plant located in Bangladesh. View location, capacity, and technical details.

Capacity
855 MW

Installed

Commissioned
2002

Year online

Owner
Summit Corporation Limited

Operator

Location
23.61, 90.60

Coordinates

Insights

#4
largest in Bangladesh
#878
largest Natural Gas worldwide
#2,832
largest worldwide
2002
3 yrs newer than avg
11
operated by Summit Corporation Limited
32
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
855 MW
Commissioned
2002
Status
Operational
Owner
Summit Corporation Limited
Country
Bangladesh
Coordinates
23.611, 90.601

Estimated Carbon Footprint

Annual CO₂
1,651,501 t

tonnes / year

Lifetime CO₂
49,545,027 t

over ~30 yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

359,022
cars / year
220,200
homes / year
75,068,223
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Meghnaghat Combined Cycle Power Plant (CCPP) is a significant power generation facility located in the Narayanganj district of Bangladesh. With a total installed capacity of 855 megawatts (MW), it plays a vital role in meeting the growing energy demands of the country. Commissioned in 2002 and owned by Summit Corporation Limited, the plant utilizes natural gas as its primary fuel source, capitalizing on the region’s abundant gas resources to generate electricity efficiently.

The Meghnaghat CCPP employs a combined cycle technology, which enhances its operational efficiency compared to traditional power generation methods. This technology allows for the simultaneous use of both gas and steam turbines, which increases the overall efficiency of the plant to approximately 55%. The natural gas is sourced from local gas fields, making it a relatively cleaner fossil fuel option compared to coal or oil, thus contributing to a reduction in greenhouse gas emissions.

In the context of Bangladesh’s energy sector, Meghnaghat CCPP is crucial for stabilizing the national grid and ensuring a reliable supply of electricity. The plant not only helps to meet the base load requirements but also supports peak demand periods, which are increasingly vital as the country experiences rapid urbanization and industrial growth. With the increasing electrification of rural areas and the need for more power-intensive industries, the plant contributes significantly to the government’s vision of energy security and economic development.

Environmental considerations are increasingly important in the operation of power plants, and the Meghnaghat CCPP has made strides to minimize its ecological footprint. By using natural gas, the plant produces lower emissions of sulfur dioxide (SO2) and nitrogen oxides (NOx) compared to coal-fired power plants. However, like any gas-fired facility, it still emits carbon dioxide (CO2), necessitating ongoing assessments and improvements to ensure compliance with environmental regulations. The facility also emphasizes the importance of maintaining operational practices that mitigate impacts on local ecosystems and communities.

Regionally, the Meghnaghat CCPP serves as a critical asset in the power supply framework of Bangladesh, supporting not only the Narayanganj district but also contributing to the wider energy needs of the Dhaka division, which is the most densely populated area of the country. The plant’s capacity to deliver substantial amounts of electricity helps to bolster industrial activities and improve quality of life for residents by providing reliable power. As Bangladesh continues to develop and diversify its energy portfolio, the Meghnaghat CCPP remains a foundational component of the nation’s energy infrastructure, aligning with the country’s goals for sustainable development and energy independence.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.