Sogamoso Dam is a 819 MW hydro power plant located in Colombia. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 819 MW
- Commissioned
- 2009
- Status
- Operational
- Owner
- Isagen
- Country
- Colombia
- Coordinates
- 7.101, -73.407
- Wikipedia
- Link
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
San Carlos
Colombia · Hydroelectric
Punchiná Dam
Colombia · Hydroelectric
Central Hidroelectrica San Carlos
Colombia · Hydroelectric
Sogamoso
Colombia · Hydroelectric
Sogamoso hydropower station
Colombia · Hydroelectric
La Sierra
Colombia · Natural Gas
About this plant
The Sogamoso Dam, located on the Sogamoso River in the Santander department of Colombia, is a significant hydroelectric power plant with a capacity of 819 megawatts (MW). Commissioned in 2009, the dam is a crucial component of Colombia’s energy sector, contributing to the country’s efforts to diversify its energy sources and reduce reliance on fossil fuels. The facility plays a vital role in providing electricity to millions of Colombians, supporting both residential and industrial needs while promoting sustainable energy practices.
As a hydroelectric power plant, the Sogamoso Dam utilizes the kinetic energy of flowing water to generate electricity. The process involves the construction of a reservoir, which stores water and creates a head difference that drives turbines. When water is released from the reservoir, it flows through turbines, which convert the hydraulic energy into mechanical energy and, subsequently, into electrical energy. This renewable energy source is particularly advantageous due to its low greenhouse gas emissions and minimal reliance on depleting natural resources, positioning hydroelectricity as a cornerstone of Colombia’s commitment to sustainable development.
The environmental impact of the Sogamoso Dam is multifaceted. On one hand, it contributes to reducing carbon emissions and air pollution by providing a cleaner alternative to fossil fuel-based energy generation. On the other hand, the construction and operation of the dam have raised concerns regarding ecological disruption, including alterations to local ecosystems, changes in water quality, and impacts on aquatic life. The Colombian government, along with various environmental organizations, continues to monitor and assess these effects, implementing measures to mitigate negative consequences and promote biodiversity in the region.
Regionally, the Sogamoso Dam holds significant importance. It not only serves as a major source of electricity for the surrounding communities but also bolsters the local economy through job creation and infrastructure development. The dam attracts tourism, offering recreational opportunities such as fishing, water sports, and hiking, enhancing local livelihoods. Additionally, the energy generated by the Sogamoso Dam supports Colombia’s national grid, ensuring stability and reliability in electricity supply, especially during peak demand periods.
In summary, the Sogamoso Dam stands as a pivotal hydroelectric facility in Colombia’s energy landscape, exemplifying the country’s dedication to renewable energy. With its substantial capacity, it plays an essential role in meeting energy demands while addressing environmental concerns and contributing to regional economic development. As Colombia continues to advance its energy strategy, the Sogamoso Dam remains a vital asset in the transition toward a more sustainable and resilient energy future.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.