Iran

Abadan Power Plant — 814 MW Natural Gas

Natural Gas Verified

Abadan Power Plant is a 814 MW gas power plant located in Iran. View location, capacity, and technical details.

Capacity
814 MW

Installed

Commissioned
2013

Year online

Owner
MAPNA Group

Operator

Location
30.40, 48.36

Coordinates

Insights

#106
largest in %s
#959
largest %s worldwide
#2,965
largest worldwide
2013
%d yrs newer than avg
71
operated by %s
22
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
814 MW
Commissioned
2013
Status
Operational
Owner
MAPNA Group
Country
Iran
Coordinates
30.402, 48.359

Estimated Carbon Footprint

Annual CO₂
1.6M t

tonnes / year

Lifetime CO₂
47.1M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

341,638
cars / year
209,538
homes / year
71.4M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Abadan Power Plant, known in Persian as نیروگاه برق آبادان, is a significant power generation facility located in Iran with a total capacity of 813.6 megawatts (MW). This gas-fired power plant plays a crucial role in the energy sector of Iran, contributing to the country’s electricity supply and supporting the growing energy demands of its population and industries. As part of Iran’s strategic initiatives to enhance energy production, the Abadan Power Plant exemplifies the country’s efforts to utilize natural gas as a primary fuel source, given its substantial domestic reserves.

Natural gas, the primary fuel for the Abadan Power Plant, is a fossil fuel that is increasingly preferred for electricity generation due to its efficiency and lower carbon emissions compared to coal and oil. The plant employs advanced gas turbine technology, which allows for high thermal efficiency and the ability to ramp up power generation quickly in response to demand fluctuations. This flexibility is essential in a region where energy needs can vary significantly due to seasonal and economic factors. The use of natural gas not only supports the plant’s operational efficiency but also aligns with Iran’s broader strategy of prioritizing cleaner energy sources to reduce environmental impacts.

The environmental implications of the Abadan Power Plant are an important consideration in the context of Iran’s energy policies. While natural gas is cleaner than other fossil fuels, its combustion still contributes to greenhouse gas emissions. The plant’s location in a densely populated region raises concerns about air quality and the health impacts on local communities. However, the Iranian government has made commitments to improve environmental standards and reduce emissions from its power plants, including the implementation of modern technologies to minimize the ecological footprint of facilities like the Abadan Power Plant.

Regionally, the Abadan Power Plant holds significant importance not only for its direct contributions to local energy supply but also for its role in enhancing energy security across Iran. The power generated from this facility supports not just the city of Abadan but also the surrounding areas, facilitating industrial growth and improving the quality of life for residents. Additionally, the plant’s strategic location in the southwestern part of Iran places it in proximity to major urban and industrial centers, making it a vital asset for regional economic development.

In summary, the Abadan Power Plant stands as a key player in Iran’s energy landscape. With its substantial capacity and reliance on natural gas, it exemplifies the transition towards cleaner energy sources while addressing the growing energy needs of the nation. As Iran continues to navigate the challenges of energy production and environmental sustainability, the Abadan Power Plant will remain a focal point in efforts to balance economic growth with ecological responsibility.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.