Australia

Torrens Island B — 800 MW Natural Gas

Natural Gas Verified

Torrens Island B is a 800 MW gas power plant located in Australia. View location, capacity, and technical details.

Capacity
800 MW

Installed

Commissioned
2004

Year online

Owner
AGL Energy Pty Ltd

Operator

Location
-34.81, 138.52

Coordinates

Insights

#31
largest in %s
#987
largest %s worldwide
#3,010
largest worldwide
2004
%d yrs newer than avg
29
operated by %s
25
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
800 MW
Commissioned
2004
Status
Operational
Owner
AGL Energy Pty Ltd
Country
Australia
Coordinates
-34.805, 138.523

Estimated Carbon Footprint

Annual CO₂
1.5M t

tonnes / year

Lifetime CO₂
46.4M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

335,927
cars / year
206,035
homes / year
70.2M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Torrens Island B Power Plant, located in South Australia, is a significant gas-fired power generation facility with a total capacity of 800 megawatts (MW). Owned and operated by AGL Energy Pty Ltd, Torrens Island B plays a crucial role in the energy sector of Australia, particularly in providing reliable and flexible electricity generation to meet the demands of the National Electricity Market (NEM). The plant is strategically positioned to support the transition to renewable energy sources while ensuring grid stability during periods of fluctuating supply and demand.

Torrens Island B primarily utilizes natural gas as its fuel source. Natural gas is a fossil fuel that is primarily composed of methane, which is known for being one of the cleanest burning fossil fuels available. When combusted, it emits significantly lower levels of carbon dioxide (CO2), sulfur dioxide (SO2), and particulate matter compared to coal. This makes natural gas a preferable option for electricity generation in the context of reducing greenhouse gas emissions and combating climate change. The flexibility of gas-fired plants, including Torrens Island B, allows them to ramp up and down quickly, providing essential support to renewable energy sources like wind and solar, which can be intermittent in nature.

In terms of environmental impact, the operation of Torrens Island B is subject to stringent regulations and monitoring to minimize its ecological footprint. While it does contribute to greenhouse gas emissions, the overall impact is significantly lower compared to traditional coal-fired power plants. AGL Energy is committed to advancing sustainability and continuously works on improving the efficiency of its gas-fired facilities, including implementing technologies that reduce emissions. Moreover, the plant incorporates measures to ensure that its operations do not adversely affect local air quality or water resources.

Regionally, Torrens Island B holds considerable significance as a backbone for South Australia’s energy supply. It plays a vital role in ensuring energy security for the region, particularly during peak demand periods when electricity consumption surges. The plant’s capability to provide quick-start power generation is essential for maintaining grid reliability as South Australia increasingly integrates renewable energy sources into its energy mix. As the nation progresses toward a more sustainable energy future, facilities like Torrens Island B are instrumental in balancing the transition while providing the necessary infrastructure to support both economic growth and environmental goals.

In conclusion, Torrens Island B Power Plant exemplifies the role of gas-fired power generation in Australia’s evolving energy landscape. With a capacity of 800 MW, it serves as a critical asset in the National Electricity Market, offering flexible power generation that complements renewable energy sources while striving to minimize environmental impacts.