Brazil

Barra Grande — 698 MW Hydroelectric

Hydroelectric Renewable Verified

Barra Grande is a 698 MW hydro power plant located in Brazil. View location, capacity, and technical details.

Capacity
698 MW

Installed

Commissioned
2005

Year online

Owner
CEMIG (Companhia Energética de Minas Gerais)

Operator

Location
-27.78, -51.19

Coordinates

Insights

#71
largest in Brazil
#559
largest Hydroelectric worldwide
#3,494
largest worldwide
2005
21 yrs newer than avg
4
operated by CEMIG (Companhia Energética…
31
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
698 MW
Commissioned
2005
Status
Operational
Owner
CEMIG (Companhia Energética de Minas Gerais)
Country
Brazil
Coordinates
-27.777, -51.193

Estimated Carbon Footprint

Annual CO₂
58,720 t

tonnes / year

Lifetime CO₂
4,697,603 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

12,765
cars / year
7,829
homes / year
2,669,092
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Barra Grande Hydroelectric Power Plant, with a capacity of 698.25 megawatts (MW), is a significant contributor to Brazil’s energy sector, particularly in the hydropower domain. Commissioned in 2005, this facility is strategically located on the Rio Teles Pires in the state of Mato Grosso, Brazil. As a hydroelectric power plant, Barra Grande utilizes the potential energy of flowing water to generate electricity, making it a vital part of Brazil’s sustainable energy infrastructure. Hydropower is a clean and renewable source of energy, and it plays a crucial role in reducing greenhouse gas emissions compared to fossil fuels. In Brazil, where rivers are abundant, hydropower is the dominant source of electricity, accounting for a substantial portion of the national grid. The Barra Grande plant not only enhances energy security but also supports economic growth in the region by providing a reliable power supply for industries and communities.

The technical aspects of the Barra Grande facility are noteworthy. The plant harnesses the kinetic energy of water as it flows through turbines, which then convert this energy into electrical power. The design and engineering of the plant allow for efficient energy conversion and minimal water loss. The facility’s reservoir helps in regulating water flow, ensuring that the plant can operate consistently even during dry seasons. This capability is crucial in maintaining a stable energy supply to meet the fluctuating demand across Brazil. Additionally, the hydroelectric process used at Barra Grande does not produce air pollutants, making it a cleaner alternative to coal or natural gas power plants.

However, the environmental impact of hydroelectric projects like Barra Grande is complex. While hydropower is a renewable energy source, the construction of dams can disrupt local ecosystems, alter water quality, and affect fish migration patterns. In the case of Barra Grande, measures have been implemented to mitigate ecological impacts, including the establishment of fish passages and monitoring programs to support local biodiversity. Furthermore, the reservoir created by the dam can provide recreational opportunities and enhance local tourism, contributing positively to the region’s economy.

Regionally, the Barra Grande Hydroelectric Power Plant holds significant importance. It not only contributes to the energy supply of Mato Grosso but also helps to stabilize the energy grid throughout Brazil. The plant plays a critical role in meeting the energy needs of a growing population and an expanding economy. Moreover, its operation contributes to regional development by creating jobs and fostering local communities. As Brazil continues to pursue its goals for renewable energy and sustainability, the Barra Grande facility stands as a testament to the country’s commitment to leveraging its natural resources responsibly and effectively.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.