Poland

EC Siekierki — 620 MW Coal

Coal Verified

EC Siekierki is a 620 MW coal power plant located in Poland. View location, capacity, and technical details.

Capacity
620 MW

Installed

Commissioned
1961

Year online

Owner
PGNiG TERMIKA

Operator

Location
52.19, 21.09

Coordinates

Insights

#34
largest in Poland
#1,336
largest Coal worldwide
#3,905
largest worldwide
1961
36 yrs older than avg
8
operated by PGNiG TERMIKA
16
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
620 MW
Commissioned
1961
Status
Operational
Owner
PGNiG TERMIKA
Country
Poland
Coordinates
52.190, 21.087

Carbon Footprint

Annual CO₂
2,449,471 t

tonnes / year

Lifetime CO₂
97,978,848 t

over ~40 yrs

Intensity
820 g

Est. gCO2/kWh

Annual emissions equivalent to

532,494
cars per year
326,596
homes per year
111,339,600
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The EC Siekierki power plant, located in Poland, is a coal-fired facility with a total capacity of 620 megawatts (MW). Owned by PGNiG TERMIKA, the plant was commissioned in 1961 and has since played a crucial role in the country’s energy sector. Situated in the capital city of Warsaw, EC Siekierki has been instrumental in providing electricity and heat to the region, particularly in the context of urban energy demands. Its operation is a significant contributor to the local grid, supplying power to millions of residents and supporting the industrial activities of the surrounding area.

The power plant utilizes coal as its primary fuel source, which is a common practice in Poland, a country that has historically relied heavily on fossil fuels for energy production. Coal is a combustible sedimentary rock composed primarily of carbon, along with various other elements. It is extracted from the earth and processed for combustion in power plants. The use of coal allows for a stable and reliable energy output; however, it also presents challenges in terms of environmental sustainability and carbon emissions.

As a coal-fired power plant, EC Siekierki is subject to rigorous environmental regulations aimed at reducing the impact of its operations. The combustion of coal generates greenhouse gases, particularly carbon dioxide (CO2), along with other pollutants such as sulfur dioxide (SO2) and nitrogen oxides (NOx), which contribute to air quality issues and climate change. Over the years, the plant has undergone various upgrades and retrofitting to improve its efficiency and reduce emissions, aligning with European Union directives on air quality and emissions standards. Nonetheless, coal remains a significant source of pollution, prompting discussions about the transition to cleaner energy sources within Poland.

Regionally, EC Siekierki holds a strategic position within Poland’s energy landscape. It not only serves as a key provider of electricity and district heating to Warsaw but also plays a vital role in the stability of the national power grid. The plant’s capacity contributes to meeting peak energy demands, particularly during the colder months when heating requirements surge. Moreover, it supports the local economy by providing jobs and contributing to the energy infrastructure that underpins economic activities in the region.

In summary, the EC Siekierki power plant exemplifies the challenges and complexities of coal dependency in Poland’s energy sector. While it continues to be a crucial energy provider, the ongoing transition towards more sustainable energy sources poses both opportunities and challenges for the future of this facility and the broader energy landscape in Poland.

More Coal plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.