Tumut 1 (Upper Tumut) is a 616 MW hydro power plant located in Australia. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 616 MW
- Commissioned
- 2002
- Status
- Operational
- Owner
- Snowy Hydro Ltd
- Country
- Australia
- Coordinates
- -35.952, 148.364
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Snowy 2.0 hydropower project
Australia · Hydroelectric
Tumut 3
Australia · Hydroelectric
Tumut 3 Power Station
Australia · Hydroelectric
Murray 1
Australia · Hydroelectric
Uranquinty
Australia · Natural Gas
Uranquinty Power Station
Australia · Natural Gas
About this plant
Tumut 1, also known as Upper Tumut, is a significant hydroelectric power station located in the Snowy Mountains of New South Wales, Australia. With a capacity of 616 megawatts (MW), it plays a crucial role in the country’s energy sector, contributing to the generation of renewable electricity and supporting the stability of the national grid. Owned and operated by Snowy Hydro Ltd., Tumut 1 is part of the larger Snowy Mountains Hydro-electric Scheme, which has been integral to Australia’s energy supply since its inception in the mid-20th century.
The power plant utilizes hydroelectric technology, which harnesses the kinetic energy of flowing water to generate electricity. Water from the Tumut River is diverted through a series of tunnels and pipes to the turbines located at the power station. This process not only provides a renewable source of energy but also minimizes greenhouse gas emissions compared to fossil fuel-based power generation. The ability to generate electricity through hydropower makes Tumut 1 a vital component in Australia’s efforts to transition towards a more sustainable energy future.
Tumut 1 operates within a complex of hydroelectric plants that work in tandem to manage water resources and electricity generation effectively. The facility is designed to maximize efficiency, with its turbines capable of generating power quickly and responding to fluctuations in electricity demand. This flexibility is essential for maintaining grid stability, especially as Australia increases its reliance on intermittent renewable energy sources such as wind and solar power.
The environmental impact of Tumut 1 is generally favorable compared to traditional fossil fuel power plants. Hydropower is known for its low carbon footprint; however, it is not without challenges. The construction and operation of the facility can affect local ecosystems, particularly aquatic habitats. Snowy Hydro Ltd. has undertaken measures to mitigate these impacts, including fish passage solutions and environmental monitoring programs to ensure the protection of biodiversity in the region.
Regionally, Tumut 1 holds significant importance not only as a power generator but also as a contributor to local economies. The facility provides employment opportunities and supports ancillary industries, including tourism and recreation. The Snowy Mountains region is well known for its natural beauty, attracting visitors year-round for activities such as skiing, hiking, and fishing, which are complemented by the presence of the hydroelectric scheme.
In summary, Tumut 1 is a pivotal player in Australia’s energy landscape, exemplifying the country’s commitment to renewable energy sources and sustainable practices. Its operational efficiency, environmental considerations, and regional contributions underline its status as a cornerstone of the Snowy Mountains Hydro-electric Scheme and the broader Australian energy sector.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.