Yusufeli Dam is a 540 MW hydro power plant located in Turkey. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 540 MW
- Commissioned
- 2022
- Status
- Operational
- Owner
- State Hydraulic Works (DSI)
- Country
- Türkiye
- Coordinates
- 40.816, 41.645
- Wikipedia
- Link
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
The Yusufeli Dam, commissioned in 2022, stands as a significant hydroelectric power plant in Turkey with a capacity of 540 megawatts (MW). Situated in the Artvin Province, this dam harnesses the potential of the Çoruh River, which is known for its swift flow and substantial water resources. The construction of the Yusufeli Dam is part of Turkey’s broader strategy to enhance its energy production through renewable resources, particularly hydroelectric power, which plays a critical role in the national energy sector.
Hydropower is a renewable energy source that generates electricity by utilizing the kinetic energy of flowing water. In the case of the Yusufeli Dam, water released from the reservoir flows through turbines, converting kinetic energy into mechanical energy, which is then transformed into electrical energy. This process not only provides a reliable source of electricity but also contributes to reducing greenhouse gas emissions compared to fossil fuel-based power generation. As a hydroelectric facility, Yusufeli Dam is expected to produce approximately 1.9 billion kilowatt-hours (kWh) of electricity annually, supplying power to thousands of households and businesses across the region.
The environmental impact of the Yusufeli Dam has been a topic of discussion among stakeholders. While hydroelectric power is generally considered cleaner than fossil fuels, large dam projects can disrupt local ecosystems, displace communities, and alter water flow patterns. The Yusufeli Dam’s construction required careful planning and implementation of environmental management strategies to mitigate these impacts. Efforts were made to ensure that the ecological balance of the surrounding area is maintained as much as possible, aiming to minimize disruptions to fish populations and local wildlife habitats.
Regionally, the Yusufeli Dam is of great significance not only for its energy production but also for its potential to stimulate economic growth and development. By providing a reliable source of electricity, the dam supports local industries and agricultural practices, which are critical for the livelihoods of people in Artvin Province and beyond. Furthermore, the infrastructure associated with the dam, including roads and facilities, can enhance connectivity and access to resources in the area, ultimately contributing to regional development.
In conclusion, the Yusufeli Dam represents a crucial advancement in Turkey’s commitment to renewable energy and sustainable development. With its substantial hydroelectric capacity, the dam plays an essential role in meeting the country’s growing energy demands while promoting environmental stewardship. As Turkey continues to diversify its energy sources and reduce reliance on fossil fuels, the Yusufeli Dam is poised to be a key asset in the nation’s energy portfolio.