Canada

Centrale Eastmain-1 — 507 MW Hydroelectric

Hydroelectric Renewable Verified

Centrale Eastmain-1 is a 507 MW hydro power plant located in Canada. View location, capacity, and technical details.

Capacity
507 MW

Installed

Commissioned
2002

Year online

Owner
Hydro-Québec

Operator

Location
52.18, -76.05

Coordinates

Insights

#89
largest in Canada
#719
largest Hydroelectric worldwide
#4,560
largest worldwide
2002
18 yrs newer than avg
175
operated by Hydro-Québec
4
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
507 MW
Commissioned
2002
Status
Operational
Owner
Hydro-Québec
Country
Canada
Coordinates
52.182, -76.051
Wikipedia
Link

Estimated Carbon Footprint

Annual CO₂
42,637 t

tonnes / year

Lifetime CO₂
3,410,934 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

9,269
cars / year
5,685
homes / year
1,938,031
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Centrale Eastmain-1 is a significant hydroelectric power plant located in the province of Quebec, Canada. With a generation capacity of 507 megawatts (MW), this facility plays a pivotal role in the country’s energy sector, contributing to Canada’s reputation as a leader in renewable energy production. Owned and operated by Hydro-Québec, the plant is part of a broader network of hydroelectric facilities that harness the abundant water resources of the region, making hydroelectricity a cornerstone of Quebec’s energy strategy.

Hydroelectric power is generated through the movement of water, typically by utilizing the potential energy of water stored in reservoirs or flowing in rivers. At Centrale Eastmain-1, water is diverted from the Eastmain River through a series of turbines, which convert kinetic energy into electrical energy. The facility’s design incorporates advanced technology to maximize efficiency and minimize environmental disruptions. The use of hydroelectric power is considered one of the cleanest forms of energy generation, as it produces no direct greenhouse gas emissions during operation, significantly reducing the carbon footprint associated with electricity generation compared to fossil fuels.

The environmental impact of hydroelectric plants like Centrale Eastmain-1 is generally more favorable than that of conventional power plants. However, the construction and operation of such facilities can alter local ecosystems and waterways, potentially affecting fish populations and aquatic habitats. Hydro-Québec engages in various environmental management practices to mitigate these impacts, including fish passage systems and habitat restoration initiatives. The company is committed to maintaining a balance between energy production and ecological preservation, recognizing the importance of sustainable practices in safeguarding the natural environment.

Regionally, Centrale Eastmain-1 serves as an essential asset for Quebec’s energy grid. The plant contributes to the stability and reliability of electricity supply, especially during peak demand periods. Quebec is known for its vast hydropower resources, which are complemented by the province’s commitment to sustainable energy policies. The Eastmain-1 facility not only supports local communities by providing jobs and economic benefits but also contributes to the overall energy independence of Canada. As the country continues to shift towards renewable energy sources to combat climate change, the significance of hydroelectric power plants like Centrale Eastmain-1 is increasingly recognized.

In conclusion, Centrale Eastmain-1 exemplifies the advantages of hydroelectric power in Canada’s energy sector. With its substantial capacity, commitment to environmental stewardship, and regional importance, the plant stands as a testament to the country’s dedication to harnessing renewable energy for a sustainable future.