BLR

Novopolotsk Thermal Power Plant Belarus — 505 MW Natural Gas

Natural Gas Verified

Novopolotsk Thermal Power Plant Belarus is a 505 MW gas power plant located in Belarus. View location, capacity, and technical details.

Capacity
505 MW

Installed

Commissioned
1964

Year online

Owner
Belenergo

Operator

Location
55.53, 28.55

Coordinates

Insights

#7
largest in Belarus
#1,624
largest Natural Gas worldwide
#4,565
largest worldwide
1964
35 yrs older than avg
17
operated by Belenergo
1
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
505 MW
Commissioned
1964
Status
Operational
Owner
Belenergo
Country
BLR
Coordinates
55.527, 28.549

Estimated Carbon Footprint

Annual CO₂
975,448 t

tonnes / year

Lifetime CO₂
29,263,437 t

over ~30 yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

212,054
cars / year
130,060
homes / year
44,338,541
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Novopolotsk Thermal Power Plant, located in the city of Novopolotsk, Belarus, is a significant energy facility with a generation capacity of 505 megawatts (MW). This power plant primarily utilizes natural gas as its fuel source, aligning with Belarus’s broader strategy to diversify its energy mix and reduce dependence on coal and other more polluting fuels. The use of natural gas is particularly important as it offers a more efficient and cleaner-burning alternative, contributing to lower greenhouse gas emissions when compared to traditional fossil fuels.

In the context of Belarus’s energy sector, the Novopolotsk Thermal Power Plant plays a critical role in ensuring a stable and reliable supply of electricity to meet the needs of both residential and industrial consumers. As a part of the country’s energy infrastructure, the plant contributes to balancing the grid, especially during peak demand periods. This is vital in a country that relies heavily on electricity for heating and industrial processes. The plant’s strategic location in the Vitebsk region allows it to serve not only Novopolotsk but also neighboring areas, thereby enhancing regional energy security and supporting local economic development.

From a technical standpoint, the Novopolotsk Thermal Power Plant is equipped with advanced gas turbine technology that maximizes efficiency and minimizes emissions. Natural gas, being a cleaner-burning fossil fuel, produces significantly lower levels of sulfur dioxide (SO2), nitrogen oxides (NOx), and particulate matter when compared to coal-fired plants. This transition to gas has been a pivotal step for Belarus in addressing environmental concerns and adhering to international emissions standards.

However, the environmental impact of the Novopolotsk Thermal Power Plant is not without challenges. While natural gas is cleaner than alternative fossil fuels, its extraction and transportation can result in methane leaks, a potent greenhouse gas. Thus, while the plant contributes to reducing overall emissions, it is essential for the operators to implement robust monitoring and management practices to mitigate these risks.

Regionally, the Novopolotsk Thermal Power Plant holds significance beyond its immediate power generation capabilities. It serves as a key player in the local economy, providing jobs and supporting ancillary industries. Additionally, the plant represents Belarus’s commitment to modernizing its energy sector and enhancing its energy independence. As the country continues to explore sustainable energy solutions, facilities like the Novopolotsk Thermal Power Plant will remain central to its efforts to balance economic growth with environmental stewardship.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.