ECU

Sopladora II — 487 MW Hydroelectric

Hydroelectric Renewable Verified

Sopladora II is a 487 MW hydro power plant located in Ecuador. View location, capacity, and technical details.

Capacity
487 MW

Installed

Commissioned
2015

Year online

Owner
CELEC EP

Operator

Location
-2.59, -78.57

Coordinates

Insights

#3
largest in %s
#747
largest %s worldwide
#4,731
largest worldwide
2015
%d yrs newer than avg
3
operated by %s
5
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
487 MW
Commissioned
2015
Status
Operational
Owner
CELEC EP
Country
ECU
Coordinates
-2.594, -78.567

Estimated Carbon Footprint

Annual CO₂
40,955 t

tonnes / year

Lifetime CO₂
3.3M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

8,903
cars / year
5,461
homes / year
1.9M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Sopladora II is a significant hydroelectric power plant located in Ecuador, with a capacity of 487 megawatts (MW). Owned and operated by CELEC EP, a state-owned electricity company, Sopladora II plays a crucial role in the country’s energy sector by contributing to the diversification and sustainability of its energy sources. As Ecuador seeks to reduce its dependence on fossil fuels and enhance its renewable energy portfolio, hydroelectric power plants like Sopladora II are central to achieving these goals.

The plant utilizes hydroelectric power, which is generated by harnessing the kinetic energy of flowing water. This method involves the construction of dams that create a reservoir, allowing water to be stored and released in a controlled manner to drive turbines. In the case of Sopladora II, the hydroelectric generation process is not only efficient but also renewable, as it relies on the natural water cycle. The abundant rainfall in Ecuador, particularly in the Andean region, ensures a reliable supply of water, making hydroelectric energy a viable option for the country.

Sopladora II is part of a broader strategy by the Ecuadorian government to increase electricity production from renewable sources, aiming for a substantial reduction in greenhouse gas emissions. The environmental impact of hydroelectric power is generally more favorable compared to fossil fuel power plants, as it produces minimal air pollutants and significantly lowers carbon emissions. However, the construction and operation of hydroelectric plants can also lead to ecological changes in local ecosystems, including alterations to river habitats and impacts on fish populations. Therefore, ensuring sustainable practices in the management of the Sopladora II plant is essential to mitigate potential ecological disruptions.

Regionally, Sopladora II enhances energy security not only for Ecuador but also for neighboring countries. By increasing the capacity of renewable energy generation, the plant supports the national grid and helps stabilize electricity supply, particularly in times of high demand. Moreover, hydroelectric plants like Sopladora II can potentially facilitate energy exports to neighboring nations, bolstering economic growth and regional cooperation in energy management. As part of a larger network of hydroelectric facilities, Sopladora II exemplifies the importance of renewable energy in fostering sustainable development in Ecuador.

In conclusion, Sopladora II is a vital asset in Ecuador’s energy landscape, representing a commitment to renewable energy resources. Its capacity to generate 487 MW of hydroelectric power underscores the country’s efforts to transition towards a more sustainable energy future, while also addressing regional energy needs and environmental conservation. As Ecuador continues to invest in renewable energy infrastructure, the role of hydroelectric power plants like Sopladora II will remain pivotal in shaping the nation’s energy policies and economic growth.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.