Kaprun Limberg II is a 480 MW hydro power plant located in Austria. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 480 MW
- Commissioned
- 2011
- Status
- Operational
- Owner
- Verbund
- Country
- Austria
- Coordinates
- 47.199, 12.722
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
The Kaprun Limberg II hydroelectric power plant, located in Austria, is a significant contributor to the country’s renewable energy infrastructure. Commissioned in 2011 and owned by Verbund, Austria’s leading electricity company, this power plant has a capacity of 480 megawatts (MW), making it one of the critical components of the national energy supply system. The plant utilizes the hydroelectric power generated from the natural flow of water, demonstrating Austria’s commitment to harnessing renewable energy resources.
As a hydroelectric facility, Kaprun Limberg II relies on the gravitational force of falling water to generate electricity. The plant is situated in the Kaprun Valley, where it benefits from the abundant water supply from the surrounding glaciers and rivers. The technology employed in hydroelectric power generation involves converting the kinetic energy of flowing water into mechanical energy, which is then transformed into electrical energy through turbines and generators. This process is highly efficient and sustainable, as it produces no direct emissions of greenhouse gases during operation, positioning hydroelectric power as a crucial element in combatting climate change.
The environmental impact of Kaprun Limberg II is predominantly positive, especially when compared to fossil fuel-based power generation. By utilizing renewable water resources, the plant significantly reduces carbon emissions and other pollutants associated with traditional energy sources. However, like all hydroelectric projects, it is essential to consider the ecological implications of damming rivers and altering natural water flow. In this regard, Verbund has implemented measures to mitigate any potential adverse effects on local wildlife and ecosystems. The plant operates within strict environmental regulations, aiming to balance energy production with ecological preservation.
In the context of Austria’s energy sector, Kaprun Limberg II plays a pivotal role in providing stable and reliable power. The plant contributes to the country’s goal of achieving a high percentage of renewable energy in its energy mix. By bolstering the supply of clean electricity, it helps reduce dependence on fossil fuels, thereby enhancing energy security and supporting Austria’s environmental objectives. The plant’s capacity allows it to meet a significant portion of regional energy demands, particularly during peak consumption periods.
Regionally, Kaprun Limberg II not only supports the local economy by providing jobs and stimulating growth but also serves as a model for sustainable development. The presence of such a facility reinforces the notion of utilizing natural resources responsibly while fostering innovation in energy technology. Overall, Kaprun Limberg II stands as a testament to Austria’s leadership in renewable energy and its ongoing commitment to sustainable practices.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.