Kalabagh Dam is a 3,600 MW hydro power plant located in Pakistan. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 3,600 MW
- Commissioned
- 1993
- Status
- Operational
- Owner
- Water and Power Development Authority (WAPDA)
- Country
- Pakistan
- Coordinates
- 32.956, 71.614
- Wikipedia
- Link
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Tarbela Dam
Pakistan · Hydroelectric
Tarbela
Pakistan · Hydroelectric
Ghazi-Barotha Hydropower Project
Pakistan · Hydroelectric
Ghazi Barotha
Pakistan · Hydroelectric
Chashma Nuclear Power Complex
Pakistan · Nuclear
Chasnupp
Pakistan · Nuclear
About this plant
The Kalabagh Dam is a significant hydroelectric power plant located on the Indus River in Pakistan, with a planned capacity of 3600 megawatts (MW). As one of the largest proposed hydroelectric projects in the country, the Kalabagh Dam plays a critical role in addressing Pakistan’s energy needs, particularly in a landscape where energy shortages are a persistent challenge. The dam is designed to harness the immense potential of the Indus River, one of the longest rivers in the world, which flows through the eastern part of Pakistan. By converting the kinetic energy of flowing water into electricity, the dam aims to provide a renewable and sustainable energy source that can reduce reliance on fossil fuels, thereby contributing to a more stable energy grid and promoting economic growth in the region.
The Kalabagh Dam operates primarily on hydroelectric power, which is generated by the gravitational force of falling or flowing water. The technical design of the dam includes a reservoir that stores water, enabling controlled release through turbines that convert the water’s kinetic energy into electrical energy. This process is not only efficient but also environmentally friendly, as it produces no direct emissions, making it a cleaner alternative to fossil fuel-based power generation. The dam’s capacity to produce 3600 MW of electricity could significantly impact Pakistan’s energy supply, particularly during peak demand periods, while also providing opportunities for water management and irrigation in the surrounding agricultural areas.
However, the development of the Kalabagh Dam has been met with considerable debate and controversy. Environmentalists and local communities have raised concerns about the potential ecological impacts of dam construction, including effects on aquatic life and river ecosystems. In addition, the dam’s construction could displace local populations and affect their livelihoods, particularly those dependent on agriculture and fishing. Balancing the need for energy production with environmental and social considerations remains a complex challenge for policymakers.
Regionally, the Kalabagh Dam holds strategic significance. It has the potential to alleviate energy shortages not just in the immediate vicinity, but across Pakistan, providing a stable power supply that can support industrial growth and improve living conditions. The dam could also play a role in flood control and irrigation, helping to mitigate the impacts of seasonal flooding and ensuring consistent water supply for agricultural activities. Given Pakistan’s reliance on agriculture as a backbone of its economy, the dam could enhance food security and economic resilience.
In conclusion, the Kalabagh Dam represents a pivotal project in Pakistan’s energy sector, combining the potential for significant power generation with the challenges of environmental stewardship and social impact. As discussions continue around its construction and operation, the dam remains a focal point for debates about sustainable energy development in the region.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.