El Quimbo Dam is a 396 MW hydro power plant located in Colombia. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 396 MW
- Commissioned
- 2011
- Status
- Operational
- Owner
- Emgesa
- Country
- Colombia
- Coordinates
- 2.451, -75.563
- Wikipedia
- Link
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Central hidroelectrica Betania
Colombia · Hydroelectric
Betania hydro power plant
Colombia · Hydroelectric
Central hidroelectrica El Quimbo
Colombia · Hydroelectric
Alto Anchicayá hydro power plant
Colombia · Hydroelectric
Salvajina Dam
Colombia · Hydroelectric
Central hidroelectrica Salvajina
Colombia · Hydroelectric
About this plant
The El Quimbo Dam is an impressive hydro power facility located in Colombia, boasting a capacity of 396 MW. Commissioned in 2011, this dam utilizes cutting-edge hydroelectric technology to transform the kinetic energy of flowing water into electricity. Positioned at coordinates 2.4506, -75.5629, El Quimbo is strategically situated to maximize the use of the region’s water resources, playing a pivotal role in Colombia’s energy generation landscape. The plant is integral to the national grid, providing a reliable source of renewable energy that supports both local communities and industrial sectors. Colombia’s energy policies emphasize the development of renewable resources, and El Quimbo Dam exemplifies this commitment by not only providing clean energy but also contributing to the country’s goals of sustainability and energy independence. As a key player in the hydroelectric sector, El Quimbo enhances the stability of the energy supply while also promoting environmental stewardship.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.