Péribonka is a 385 MW hydro power plant located in Canada. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 385 MW
- Commissioned
- 2000
- Status
- Operational
- Owner
- Hydro-Québec
- Country
- Canada
- Coordinates
- 49.508, -71.182
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Shipshaw
Canada · Hydroelectric
Chute-des-Passes
Canada · Hydroelectric
Isle-Maligne
Canada · Hydroelectric
Centrale d'isle Maligne
Canada · Hydroelectric
Chute-du-Diable
Canada · Hydroelectric
Chute-à-la-Savane
Canada · Hydroelectric
About this plant
The Péribonka power plant is a significant hydroelectric facility located in Canada, contributing to the country’s vast renewable energy generation capabilities. With a capacity of 385 MW, this power plant is operated by Hydro-Québec and plays a crucial role in the province’s energy mix, which is predominantly renewable. Situated at coordinates 49.5077° N and -71.1824° W, Péribonka is strategically located to harness the region’s abundant water resources, generating clean electricity through hydroelectric technology. The plant utilizes a dam-based system, which not only produces power but also supports local ecosystems and water management efforts. Canada’s energy policies strongly support renewable energy development, and the significance of Péribonka cannot be overstated as it exemplifies the country’s commitment to sustainability and low-carbon energy solutions. The facility not only meets local energy demands but also contributes to the stability of the broader North American grid, highlighting the importance of hydroelectric power in achieving energy independence and environmental goals.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.