Corumbá I is a 375 MW hydro power plant located in Brazil. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 375 MW
- Commissioned
- 1996
- Status
- Operational
- Owner
- Companhia Energética de Minas Gerais (CEMIG)
- Country
- Brazil
- Coordinates
- -17.989, -48.531
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
Corumbá I stands as a significant power generation facility within Brazil’s energy landscape, located in the central region of the country at coordinates -17.9893° S latitude and -48.5310° W longitude. Commissioned in 1996, this hydroelectric power plant has an impressive capacity of 375.3 MW, harnessing the natural flow of water to generate electricity. The hydroelectric technology used in Corumbá I enables it to convert kinetic energy from flowing water into electrical energy, making it a sustainable and renewable source of power. As Brazil continues to prioritize renewable energy sources in its national energy strategy, Corumbá I contributes significantly to the energy mix, providing clean power that helps reduce reliance on fossil fuels. This facility not only supports the regional energy needs but also plays a vital role in stabilizing the local grid, particularly during dry seasons when hydro resources can fluctuate. The strategic location of Corumbá I enhances its capacity to supply electricity to nearby urban centers, promoting economic growth and development in the region. As Brazil moves towards ambitious energy targets, the role of hydroelectric plants like Corumbá I remains crucial in achieving a more sustainable and diversified energy future.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.