Brazil

Termo Norte II — 350 MW Natural Gas

Natural Gas Verified

Termo Norte II is a 350 MW gas power plant located in Brazil. View location, capacity, and technical details.

Capacity
350 MW

Installed

Commissioned
2001

Year online

Owner
Petrobras

Operator

Location
-8.79, -63.81

Coordinates

Insights

#133
largest in %s
#2,107
largest %s worldwide
#5,665
largest worldwide
2001
%d yrs newer than avg
139
operated by %s
11
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
350 MW
Commissioned
2001
Status
Operational
Owner
Petrobras
Country
Brazil
Coordinates
-8.791, -63.806

Estimated Carbon Footprint

Annual CO₂
675,956 t

tonnes / year

Lifetime CO₂
20,278,693 t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

146,947
cars / year
90,128
homes / year
30,725,292
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Termo Norte II is a notable gas-fired power generation facility located in Brazil, specifically designed to contribute to the country’s energy needs with a capacity of 349.95 MW. Commissioned in 2001, this power plant is positioned at coordinates -8.7905, -63.8061, in the northern region of Brazil, where energy demand is growing rapidly. The facility operates on gas technology, which is favored for its efficiency and lower emissions compared to other fossil fuels. As a part of the Brazilian energy landscape, Termo Norte II plays a crucial role in providing reliable electricity to the local grid, especially during peak demand periods. The operational context of this power plant is particularly important as Brazil continues to enhance its energy infrastructure to support economic growth and development. The strategic use of gas not only assists in stabilizing the energy supply but also aligns with Brazil’s ongoing efforts to transition towards more sustainable energy sources. As such, Termo Norte II exemplifies the essential balance between meeting immediate energy needs and pursuing long-term energy policy goals.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.