ALB

Vau i Dijes — 250 MW Hydroelectric

Hydroelectric Renewable Verified

Vau i Dijes is a 250 MW hydro power plant located in Albania. View location, capacity, and technical details.

Capacity
250 MW

Installed

Commissioned
1971

Year online

Owner
KESH (Albanian Power Corporation)

Operator

Location
42.01, 19.64

Coordinates

Insights

#3
largest in %s
#1,236
largest %s worldwide
#6,657
largest worldwide
1971
%d yrs older than avg
1
operated by %s
7
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
250 MW
Commissioned
1971
Status
Operational
Owner
KESH (Albanian Power Corporation)
Country
ALB
Coordinates
42.014, 19.636

Estimated Carbon Footprint

Annual CO₂
21,024 t

tonnes / year

Lifetime CO₂
1.7M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

4,570
cars / year
2,803
homes / year
955,636
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Vau i Dijes is a significant hydroelectric power plant located in Albania, marked by its impressive 250 MW capacity. Commissioned in 1971, this facility plays a vital role in the national energy landscape, contributing to the renewable energy generation mix within the country. The plant harnesses the power of flowing water, utilizing advanced hydro technology to convert kinetic energy into electrical energy. Given Albania’s abundant water resources, hydroelectric power generation is a cornerstone of its energy strategy, aligning with the country’s goals of sustainability and reduced reliance on fossil fuels. Vau i Dijes is strategically situated at coordinates 42.0137, 19.6359, in a region where hydropower generation is not only feasible but also essential for meeting local energy demands. The power generated by this facility is crucial for stabilizing the local grid, which is often challenged by fluctuating consumption patterns. The plant’s operational context is influenced by Albania’s energy policy, which emphasizes the importance of renewable sources, particularly hydropower, in achieving energy independence and sustainability. Vau i Dijes is operated by the state-owned company, which ensures that this power generation facility remains a reliable source of energy for both domestic and commercial use. The commitment to hydroelectric power is evident in Albania’s ongoing investments in maintaining and upgrading such facilities, ensuring they remain efficient and capable of meeting future energy needs.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.