Spain

VALDECANAS 3 — 247 MW Hydroelectric

Hydroelectric Renewable Verified

VALDECANAS 3 is a 247 MW hydro power plant located in Spain. View location, capacity, and technical details.

Capacity
247 MW

Installed

Commissioned
1964

Year online

Owner
IBERDROLA GENERACION S.A.

Operator

Location
39.78, -5.61

Coordinates

Insights

#119
largest in %s
#1,257
largest %s worldwide
#6,750
largest worldwide
1964
%d yrs older than avg
32
operated by %s
47
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
247 MW
Commissioned
1964
Status
Operational
Owner
IBERDROLA GENERACION S.A.
Country
Spain
Coordinates
39.778, -5.612

Estimated Carbon Footprint

Annual CO₂
20,786 t

tonnes / year

Lifetime CO₂
1.7M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

4,519
cars / year
2,771
homes / year
944,819
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The VALDECANAS 3 hydroelectric power generation facility stands as the 119th largest among Spain’s 981 plants, with a capacity of 247.17 MW. This makes it one of the notable contributors to the country’s hydroelectric sector, ranking 27th among 155 hydro plants nationwide. Commissioned in 1964, VALDECANAS 3 is a testament to Spain’s long-standing commitment to harnessing renewable energy sources, particularly in the face of a national energy landscape still heavily influenced by gas.

Employing advanced hydroelectric technology, VALDECANAS 3 generates electricity by utilizing the gravitational force of falling or flowing water. This method not only ensures a stable and reliable power supply but also supports Spain’s transition towards sustainable energy practices. The facility’s contribution represents approximately 0.20% of the total 122,104 MW capacity across Spain’s power plants, highlighting its role in a diverse energy portfolio.

Situated within a region rich in energy infrastructure, VALDECANAS 3 is in proximity to several significant plants, including the Almaraz Nuclear Power Plant and the Almaraz Solar facility, both boasting impressive capacities of 2017 MW each. Additionally, the Valdecañas Dam and the Presa de Valdecañas, each with a capacity of 249 MW, contribute to the local hydroelectric output. This clustering of diverse energy sources enhances the reliability of the regional grid and promotes energy security.

Spain’s energy profile is marked by a significant reliance on natural gas, yet projects like VALDECANAS 3 exemplify the country’s efforts to integrate renewable sources into its energy mix. With the ongoing push for sustainability and environmental responsibility, the role of hydroelectric facilities becomes increasingly vital.

Operated by IBERDROLA GENERACION S.A., VALDECANAS 3 not only provides electricity but also contributes to local economies and job creation. As Spain continues to evolve its energy strategy, the significance of facilities such as VALDECANAS 3 will only grow, supporting both the national objectives for renewable energy and the global imperative for a cleaner, more sustainable future.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.