Brazil

Aparecida Parte I — 241 MW Oil

Oil Verified

Aparecida Parte I is a 241 MW oil power plant located in Brazil. View location, capacity, and technical details.

Capacity
241 MW

Installed

Commissioned
1997

Year online

Owner
Petrobras

Operator

Location
-3.13, -60.02

Coordinates

Insights

#162
largest in %s
#270
largest %s worldwide
#6,801
largest worldwide
1997
at fleet average
139
operated by %s
23
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
241 MW
Commissioned
1997
Status
Operational
Owner
Petrobras
Country
Brazil
Coordinates
-3.126, -60.023

Estimated Carbon Footprint

Annual CO₂
548,309 t

tonnes / year

Lifetime CO₂
16.4M t

over ~%d yrs

Intensity
650 g

gCO₂ per kWh

Annual emissions equal to

119,198
cars / year
73,108
homes / year
24.9M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Aparecida Parte I stands out as Brazil’s 162nd largest power generation facility, with a capacity of 240.74 MW, making it the 4th largest oil plant among 622 in the country. This facility plays a strategic role in Brazil’s energy landscape, which is predominantly hydroelectric, yet still heavily reliant on oil and gas. Contributing 0.10% to Brazil’s total capacity of 250,382 MW, Aparecida Parte I represents the diversification of energy sources necessary for national energy security. Utilizing modern oil generation technology, the plant transforms oil into electricity, serving as a vital supplement to the nation’s hydroelectric resources. In the vicinity, Aparecida Parte I is complemented by several gas-fired plants, including the Jaraqui Power Plant at 156.6 MW and the Tambaqui Power Plant at 155.8 MW, as well as other oil facilities like Electron (TG) at 120 MW. This clustering of energy generation facilities within a 50 km radius enhances the reliability of the local grid, ensuring that energy demands are met efficiently. Given Brazil’s vast energy profile, which includes 2402 total plants, the average power plant capacity is markedly lower than that of Aparecida Parte I, indicating its significance in the regional context. Commissioned in 1997, the facility is operated with a focus on maximizing output while adhering to environmental standards. As Brazil continues to develop its energy infrastructure, the role of Aparecida Parte I is expected to evolve, particularly in balancing the country’s reliance on renewable sources with the ongoing demand for fossil fuels.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.