Brazil

CST — 225 MW Oil

Oil Verified

CST is a 225 MW oil power plant located in Brazil. View location, capacity, and technical details.

Capacity
225 MW

Installed

Commissioned
2003

Year online

Owner
Petrobras

Operator

Location
-20.13, -40.30

Coordinates

Insights

#171
largest in %s
#279
largest %s worldwide
#7,015
largest worldwide
2003
%d yrs newer than avg
139
operated by %s
26
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
225 MW
Commissioned
2003
Status
Operational
Owner
Petrobras
Country
Brazil
Coordinates
-20.125, -40.299

Estimated Carbon Footprint

Annual CO₂
512,688 t

tonnes / year

Lifetime CO₂
15.4M t

over ~%d yrs

Intensity
650 g

gCO₂ per kWh

Annual emissions equal to

111,454
cars / year
68,358
homes / year
23.3M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Positioned as the fifth largest oil power generation facility in Brazil, CST holds a significant place in the country’s vast energy landscape. With a capacity of 225.1 MW, CST contributes a modest 0.09% to Brazil’s total power generation capacity of 250,382 MW, which is dominated by hydroelectric sources. This ranking of #171 out of 2,402 plants reflects not only the plant’s output but also its critical role in diversifying Brazil’s energy portfolio, especially in a region where hydropower is prevalent. CST operates using oil as its primary fuel, which is notable given Brazil’s focus on renewable resources, making this facility a key player in ensuring energy reliability and stability. The plant utilizes advanced combustion technology to convert oil into electricity efficiently, thereby supporting the local grid. Geographically, CST is surrounded by several other plants, including Maranhão V, a gas facility with a capacity of 337.6 MW, and Aracruz, which produces 210.4 MW from biomass. This clustering of energy sources in the vicinity fosters a robust energy ecosystem, though CST’s oil reliance contrasts sharply with the renewable energy trends seen in nearby facilities. In comparison, the Maranhão V plant’s output exceeds CST’s, showcasing gas as a more dominant and perhaps favored fuel type in the region. Overall, CST’s operation is vital for maintaining energy balance in a market where hydro resources alone might not suffice. The plant was commissioned in 2003 and has since been operated to ensure energy supply during peak demand periods. As Brazil continues to pursue a greener energy future, the role of facilities like CST will be pivotal in the transition phase, balancing traditional fuel sources with the increasing adoption of renewables.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.