Central termoelectrica Felipe Carrillo Puerto is a 220 MW gas power plant located in Mexico. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Natural Gas
- Capacity
- 220 MW
- Commissioned
- 1989
- Status
- Operational
- Owner
- Comisión Federal de Electricidad (CFE)
- Country
- Mexico
- Coordinates
- 20.698, -88.267
Estimated Carbon Footprint
tonnes / year
over ~30 yrs
gCO₂ per kWh
Annual emissions equal to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Stations
Valladolid III
Mexico · Natural Gas
Central de ciclo combinado Valladolid III
Mexico · Natural Gas
Mérida III combined cycle power station
Mexico · Oil
Mérida III combined cycle power station
Mexico · Natural Gas
Mérida III
Mexico · Natural Gas
Felipe Carrillo Puerto (Valladolid)
Mexico · Natural Gas
About this plant
Central termoeléctrica Felipe Carrillo Puerto holds the 168th position among Mexico’s 419 power generation facilities, with a generation capacity of 220 MW, accounting for 0.16% of the nation’s total capacity of 141,268 MW. This facility, commissioned in 1989, utilizes advanced gas-fired technology, contributing to a cleaner energy output compared to older generation methods. The region is not without competition, as it is surrounded by larger gas plants like Valladolid III and its combined cycle counterpart, both generating 525 MW each. These neighboring facilities represent a significant portion of the local energy landscape, emphasizing the strategic importance of Felipe Carrillo Puerto in balancing the grid’s energy supply. Despite its lower capacity in comparison to nearby plants, Felipe Carrillo Puerto serves a crucial role in supporting the region’s energy needs, especially given Mexico’s reliance on gas as the dominant fuel source. With a national average capacity of around 337 MW per plant, Felipe Carrillo Puerto’s output is typical yet underscores the importance of each facility in maintaining overall grid reliability. The management of this power generation facility reflects a commitment to sustainable practices in an evolving energy market. Looking toward the future, Central termoeléctrica Felipe Carrillo Puerto is poised to enhance its operational efficiency and contribute to Mexico’s goals of increasing renewable energy integration while continuing to provide essential power to local communities.
More Natural Gas plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.