Russia

Argayash CHP — 195 MW Coal

Coal Verified

Argayash CHP is a 195 MW coal power plant located in Russia. View location, capacity, and technical details.

Capacity
195 MW

Installed

Commissioned
1954

Year online

Owner
PJSC "Fortum"

Operator

Location
55.64, 60.78

Coordinates

Insights

#277
largest in %s
#2,144
largest %s worldwide
#7,587
largest worldwide
1954
%d yrs older than avg
8
operated by %s
5
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
195 MW
Commissioned
1954
Status
Operational
Owner
PJSC "Fortum"
Country
Russia
Coordinates
55.639, 60.779

Estimated Carbon Footprint

Annual CO₂
770,398 t

tonnes / year

Lifetime CO₂
30.8M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

167,478
cars / year
102,720
homes / year
35M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Argayash CHP, a coal-fired power generation facility located in Russia, plays an important role in the nation’s energy landscape with a capacity of 195 MW. Ranking as the 277th largest among 652 plants in Russia, it contributes to approximately 0.06% of the country’s total capacity of 315,886 MW. This facility, commissioned in 1954, holds the 73rd position among 112 coal plants in Russia, underscoring its relevance within the coal sector, albeit in a diminishing coal landscape. The plant utilizes traditional coal combustion technology, which, while effective for energy generation, faces scrutiny in the current climate-focused era. Nearby, the Аргаяшская ТЭЦ also contributes 195 MW, illustrating a unique context where two similarly sized coal plants operate within close proximity. This situation reflects the historical reliance on coal within the region, even as the country shifts towards a gas-dominated energy profile. In Russia, natural gas has become the predominant fuel source, pushing coal facilities like Argayash CHP into a more challenging competitive position. As a result, the Argayash plant’s operational strategies must adapt to a landscape increasingly influenced by environmental regulations and renewable energy initiatives. The operator, PJSC ‘Fortum’, has been managing this facility for decades, balancing the need for reliable power generation with the pressures of modern energy demands and sustainability. Looking ahead, the future of Argayash CHP is uncertain, as the energy sector is likely to continue its transition towards cleaner alternatives. The plant’s ongoing operational viability will depend on its ability to innovate and potentially integrate more sustainable practices while continuing to serve the local grid and support the regional economy.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.