Coteau Creek is a 186 MW hydro power plant located in Canada. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 186 MW
- Commissioned
- 1996
- Status
- Operational
- Owner
- Saskatchewan Power Corp
- Country
- Canada
- Coordinates
- 51.275, -106.874
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
The Coteau Creek hydroelectric facility, with its 186 MW capacity, stands as the 178th largest power generation facility in Canada and ranks 100th among the country’s 612 hydro plants. Contributing 0.10% to Canada’s total power generation capacity of 193,190 MW, Coteau Creek exemplifies the country’s commitment to harnessing hydroelectric power. Operated by Saskatchewan Power Corp, this facility utilizes advanced hydro technology to convert the kinetic energy of flowing water into electricity, ensuring a sustainable energy source in a region that benefits from abundant freshwater resources. Notably, Coteau Creek is situated in an isolated location, with no nearby plants within a 50 km radius, which underscores its importance in providing a reliable energy source to the local grid. In contrast to Canada’s diverse energy profile—where hydroelectric power is the dominant fuel—Coteau Creek’s capacity plays a crucial role in supporting the grid’s stability and reliability. As the nation continues to prioritize clean energy initiatives, Coteau Creek serves as a vital asset in reducing greenhouse gas emissions while supporting the local economy. The ongoing evolution of technology in hydroelectric generation promises to enhance the plant’s efficiency and output, further solidifying its position in Canada’s energy sector.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.