Colombia

Termocartagena — 180 MW Natural Gas

Natural Gas Verified

Termocartagena is a 180 MW gas power plant located in Colombia. View location, capacity, and technical details.

Capacity
180 MW

Installed

Commissioned
2015

Year online

Owner
Termocartagena S.A.

Operator

Location
10.36, -75.51

Coordinates

Insights

#64
largest in %s
#2,727
largest %s worldwide
#7,773
largest worldwide
2015
%d yrs newer than avg
1
operated by %s
8
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
180 MW
Commissioned
2015
Status
Operational
Owner
Termocartagena S.A.
Country
Colombia
Coordinates
10.356, -75.510

Estimated Carbon Footprint

Annual CO₂
347,684 t

tonnes / year

Lifetime CO₂
10.4M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

75,584
cars / year
46,358
homes / year
15.8M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Situated in Colombia, Termocartagena stands out as the 64th largest power generation facility in the country, contributing a capacity of 180 MW, which accounts for a modest 0.48% share of Colombia’s total energy output. This facility is notable for being one of the 24 gas power plants in Colombia, ranking 19th in this category. Its significance lies not only in its capacity but also in its strategic location within a region characterized by a diversity of energy sources. This facility utilizes gas as its primary fuel, a choice that aligns with Colombia’s ongoing transition towards a more diversified energy mix, although hydroelectric power remains dominant in the national context. The nearby Termocandelaria plant, with a more substantial capacity of 314 MW, underscores the competitive energy landscape in this region, while the Cartagena oil plant adds further diversity with its 188 MW output. The Proeléctrica Mamonal facility, generating 90 MW from gas, rounds out the local energy cluster within a 50 km radius. In Colombia’s energy profile, which comprises 127 plants and a total capacity of 37,499 MW, Termocartagena plays a role in balancing the grid, especially as the country increasingly seeks to integrate more renewable sources. The facility is operated by a local entity and, although commissioned years ago, it continues to be an essential player in the energy sector. As Colombia eyes a future with a greater emphasis on renewable energy, Termocartagena’s role in ensuring energy reliability and stability will be crucial, especially in a landscape where gas plants are becoming vital for supporting intermittent renewable resources.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.