BIH

Trebinje I Hydroelectric Power Plant Bosnia and Herzegovina — 180 MW Hydroelectric

Hydroelectric Renewable Verified

Trebinje I Hydroelectric Power Plant Bosnia and Herzegovina is a 180 MW hydro power plant located in Bosnia and Herzegovina. View location, capacity, and technical details.

Capacity
180 MW

Installed

Commissioned
1970

Year online

Owner
Elektroprivreda BiH

Operator

Location
42.73, 18.50

Coordinates

Insights

#9
largest in %s
#1,562
largest %s worldwide
#7,773
largest worldwide
1970
%d yrs older than avg
13
operated by %s
11
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
180 MW
Commissioned
1970
Status
Operational
Owner
Elektroprivreda BiH
Country
BIH
Coordinates
42.734, 18.497

Estimated Carbon Footprint

Annual CO₂
15,137 t

tonnes / year

Lifetime CO₂
1.2M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

3,291
cars / year
2,018
homes / year
688,058
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Positioned as the 9th largest power generation facility in Bosnia and Herzegovina, the Trebinje I Hydroelectric Power Plant stands at the forefront of the nation’s renewable energy sector. With a capacity of 180 MW, this hydroelectric facility contributes a substantial 4.52% to the total national capacity of 3,986 MW. The plant utilizes state-of-the-art hydroelectric technology, which harnesses the kinetic energy of flowing water to generate electricity, marking it as the 5th largest hydro plant in a country where hydroelectric power is the dominant fuel source. The Trebinje I facility is strategically located within a region that boasts other significant power plants, including the Gacko Coal CHP Power Plant with a capacity of 300 MW and the Dubrovnik Hydroelectric Power Plant, which generates 216 MW. This clustering of both hydroelectric and coal facilities illustrates the diverse energy landscape of Bosnia and Herzegovina, where renewable resources are being increasingly prioritized. The national energy profile indicates a strong commitment to hydroelectric power, evidenced by the presence of 16 hydro plants among 20 total facilities. Operated by a national energy company, Trebinje I has been instrumental since its commissioning in enhancing grid reliability and promoting sustainable energy solutions. Looking ahead, the facility’s role in supporting Bosnia and Herzegovina’s transition towards a greener energy future is pivotal, as it not only provides essential power generation but also contributes to the reduction of carbon emissions associated with fossil fuel use.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.