New Zealand

Nga Awa Purua — 138 MW Geothermal

Geothermal Renewable Verified

Nga Awa Purua is a 138 MW geothermal power plant located in New Zealand. View location, capacity, and technical details.

Capacity
138 MW

Installed

Commissioned
2010

Year online

Owner
Mercury Energy

Operator

Location
-38.61, 176.18

Coordinates

Insights

#13
largest in %s
#28
largest %s worldwide
#8,775
largest worldwide
2010
%d yrs newer than avg
12
operated by %s
16
plants within 100 km

Technical Details

Fuel Type
Geothermal
Capacity
138 MW
Commissioned
2010
Status
Operational
Owner
Mercury Energy
Country
New Zealand
Coordinates
-38.614, 176.183

Estimated Carbon Footprint

Annual CO₂
36,750 t

tonnes / year

Lifetime CO₂
1.1M t

over ~%d yrs

Intensity
38 g

gCO₂ per kWh

Annual emissions equal to

7,989
cars / year
4,900
homes / year
1.7M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Ranked as the 13th largest power generation facility in New Zealand, Nga Awa Purua stands out as the foremost geothermal plant in the nation, contributing significantly to the country’s renewable energy landscape. With a capacity of 138 MW, it accounts for approximately 2.07% of New Zealand’s total power generation capacity of 6,675 MW, which predominantly relies on hydroelectric sources. The plant was commissioned in 2010 and is operated by Mercury Energy, a key player in New Zealand’s energy sector, known for its commitment to sustainable energy solutions.

Nga Awa Purua utilizes cutting-edge geothermal technology, harnessing the Earth’s natural heat to generate electricity efficiently. This facility exemplifies how geothermal energy can serve as a stable and reliable power source, particularly in a country where hydroelectricity reigns supreme. The ability to tap into geothermal resources not only diversifies New Zealand’s energy portfolio but also provides a consistent output that complements the variable nature of hydro generation.

Located within a rich energy corridor, Nga Awa Purua is surrounded by several notable plants, including Maraetai, a hydro facility with a robust capacity of 352 MW, and Wairakei, another geothermal plant generating 132 MW. Other nearby geothermal facilities such as Ohaaki (122 MW) and Mokai (112 MW), along with the hydroelectric station Ohakuri (106 MW), create a dynamic energy cluster that enhances grid reliability and fosters regional energy security. This geographical concentration of power generation facilities allows for improved infrastructure and operational synergies, ensuring that energy demands in the region are met efficiently.

In the broader context of New Zealand’s energy profile, where hydroelectric power dominates, the role of Nga Awa Purua becomes even more critical. As the energy landscape shifts towards more sustainable practices, the plant exemplifies how geothermal energy can play a pivotal role in reducing reliance on fossil fuels while supporting the grid’s stability.

Mercury Energy has positioned itself as a leader in the renewable sector, with Nga Awa Purua being a testament to its strategic investments in geothermal technology. The commissioning of the plant in 2010 marked a significant milestone for the company and the nation, illustrating the potential for geothermal energy to meet future energy needs.

Looking ahead, Nga Awa Purua holds promise not just for its energy output but also for its environmental impact. By harnessing geothermal energy, it reduces greenhouse gas emissions and contributes to New Zealand’s ambitious sustainability goals. As the country continues to innovate and expand its renewable energy capacities, facilities like Nga Awa Purua will undoubtedly play a crucial role in shaping a cleaner, greener future.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.