Nesjavellir is a 120 MW geothermal power plant located in Iceland. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Geothermal
- Capacity
- 120 MW
- Commissioned
- 1998
- Status
- Operational
- Owner
- Orkuveita Reykjavíkur
- Country
- ISL
- Coordinates
- 64.108, -21.257
Estimated Carbon Footprint
tonnes / year
over ~30 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
Nesjavellir is a 120 MW geothermal power plant located in Iceland, operated by Orkuveita Reykjavíkur since its commissioning in 1998. The facility generates electricity using geothermal energy sourced from the earth’s heat.
It ranks as the 2nd largest geothermal plant in Iceland. With 120 MW, it represents 20.98% of Iceland’s total geothermal capacity of 572 MW. Iceland has 6 geothermal plants with a combined capacity of 572 MW. Compared to the largest geothermal plant, Hellisheiði at 213 MW, this facility is about 56.3% the size.
Geothermal energy is a significant contributor to Iceland’s energy supply, accounting for approximately 30% of the country’s electricity generation. The Nesjavellir plant takes advantage of Iceland’s geothermal resources, supporting the shift towards renewable energy. The facility is located about 30 km from Reykjavik in the southwestern region of Iceland.