United States

H M Jackson — 112 MW Hydroelectric

Hydroelectric Renewable Verified

H M Jackson is a 112 MW hydro power plant located in United States of America. View location, capacity, and technical details.

Capacity
112 MW

Installed

Commissioned
1984

Year online

Owner
PUD 1 of Snohomish County

Operator

Location
47.91, -121.81

Coordinates

Insights

#2,000
largest in %s
#2,168
largest %s worldwide
#9,582
largest worldwide
1984
at fleet average
6
operated by %s
31
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
112 MW
Commissioned
1984
Status
Operational
Owner
PUD 1 of Snohomish County
Country
United States
Coordinates
47.908, -121.814

Estimated Carbon Footprint

Annual CO₂
9,402 t

tonnes / year

Lifetime CO₂
752,155 t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

2,044
cars / year
1,254
homes / year
427,361
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

H M Jackson is a hydroelectric power station with a capacity of 111.8 MW located in the United States. The plant is operated by PUD 1 of Snohomish County and was commissioned in 1984. It utilizes water flow to generate electricity.

H M Jackson ranks as the 177th largest hydro plant in the United States. With its capacity of 111.8 MW, it contributes approximately 0.09% to the country’s total hydro capacity of 117,947 MW. The U.S. has 1,469 hydro plants with a combined capacity of 117,947 MW. Compared to the largest hydro plant, Grand Coulee Dam at 6,809 MW, H M Jackson is about 1.6% the size.

Hydropower is a vital part of the U.S. energy landscape, supplying around 6% of the total electricity generation. The Pacific Northwest, where H M Jackson is located, is known for its abundant water resources. The plant is situated approximately 70 miles northeast of Seattle.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.