- Capacity
- 759 MW
- Commissioned
- 2006
- Status
- Operational
- Owner
- GAS NATURAL FENOSA GENERACION S.L.U.
- Country
- Spain
- Coordinates
- 39.943, -3.855
Estimated Carbon Footprint
tonnes / year
over ~30 yrs
gCO₂ per kWh
Annual emissions equal to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Stations
About this plant
The ACECA GRUPO 4 power plant, located in Spain, plays a significant role in the country’s energy sector, contributing a substantial capacity of 758.74 megawatts (MW) primarily through the use of natural gas as its fuel source. Commissioned in 2006 and owned by GAS NATURAL FENOSA GENERACION S.L.U., this facility is part of Spain’s broader commitment to diversifying its energy portfolio and reducing reliance on coal and other more polluting energy sources.
Natural gas is considered a cleaner alternative to coal and oil, emitting significantly lower amounts of carbon dioxide and other harmful pollutants when combusted. The ACECA GRUPO 4 power plant utilizes combined cycle technology, which enhances its efficiency by using both gas and steam turbines to generate electricity. This method allows for the recovery of waste heat from the gas turbines, which is then used to produce steam that drives a steam turbine, thereby maximizing energy output from the same fuel input. As a result, the plant operates with a higher efficiency rate compared to traditional power plants, making it a crucial asset in meeting energy demands while mitigating environmental impacts.
The environmental implications of natural gas as a fuel source are generally more favorable than those associated with coal or oil. However, it is essential to consider the entire lifecycle of natural gas, including extraction, transportation, and potential methane emissions during these processes. Despite these concerns, ACECA GRUPO 4 aligns with Spain’s environmental goals by contributing to a reduction in greenhouse gas emissions and supporting the transition to a more sustainable energy system.
Regionally, the ACECA GRUPO 4 power plant holds significance not just for its output capacity but also for its role in stabilizing the electricity grid in Spain. As the country continues to increase its share of renewable energy sources, such as wind and solar, the demand for flexible and reliable power generation becomes increasingly critical. Natural gas plants like ACECA GRUPO 4 provide that essential flexibility, as they can quickly ramp up or down to balance the intermittency of renewable energy generation.
In summary, the ACECA GRUPO 4 power plant is a key player in Spain’s energy landscape. By utilizing advanced technology to harness natural gas, it contributes to both energy security and environmental sustainability. Its efficient operation and ability to complement renewable energy sources make it an integral part of Spain’s efforts to transition towards a cleaner, more diversified energy future.