Philippines

AGUS 2 — 180 MW Hydroelectric

Hydroelectric Renewable Verified

AGUS 2 is a 180 MW hydro power plant located in Philippines. View location, capacity, and technical details.

Capacity
180 MW

Installed

Commissioned
1985

Year online

Owner
National Power Corporation

Operator

Location
8.05, 124.27

Coordinates

Insights

#54
largest in Philippines
#1,562
largest Hydroelectric worldwide
#7,773
largest worldwide
1985
1 yrs newer than avg
32
operated by National Power Corporation
18
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
180 MW
Commissioned
1985
Status
Operational
Owner
National Power Corporation
Country
Philippines
Coordinates
8.053, 124.271

Estimated Carbon Footprint

Annual CO₂
15,137 t

tonnes / year

Lifetime CO₂
1,210,982 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

3,291
cars / year
2,018
homes / year
688,058
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

AGUS 2 stands out as the 54th largest power generation facility in the Philippines, contributing significantly to the national grid with a capacity of 180 MW. This hydroelectric plant holds a respectable position as the 11th largest hydro facility among 27 across the archipelago, playing a crucial role in harnessing the country’s abundant water resources. The technology employed here is typical of hydro plants, utilizing the kinetic energy of flowing water to produce electricity efficiently while minimizing carbon emissions. Located in the province of Lanao del Sur, AGUS 2 is part of a remarkable cluster of hydro plants along the Agus River, including AGUS 5, with a capacity of 309 MW, and AGUS 1, which generates 80 MW. Together, these facilities enhance the region’s energy security by diversifying the fuel mix, which is predominantly coal-based, as coal remains the dominant fuel across the country. With a national capacity of 35,822 MW from a total of 223 plants, AGUS 2’s output represents approximately 0.50% of the Philippines’ total energy supply. This contribution is vital in a landscape where renewable sources are increasingly prioritized. The plant is operated by the National Power Corporation (NPC) and commenced operations in 1996, reflecting the government’s commitment to developing hydroelectric resources. Looking ahead, AGUS 2 is positioned to play an even more significant role in the Philippines’ energy transition, supporting goals for sustainability and reduced greenhouse gas emissions while providing reliable energy to the local grid.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.