Norway

Ana-Sira — 183 MW Hydroelectric

Hydroelectric Renewable Verified

Ana-Sira is a 183 MW hydro power plant located in Norway. View location, capacity, and technical details.

Capacity
183 MW

Installed

Commissioned
2001

Year online

Owner
Statkraft

Operator

Location
58.30, 6.45

Coordinates

Insights

#64
largest in %s
#1,549
largest %s worldwide
#7,745
largest worldwide
2001
%d yrs newer than avg
264
operated by %s
37
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
183 MW
Commissioned
2001
Status
Operational
Owner
Statkraft
Country
Norway
Coordinates
58.295, 6.453
Wikipedia
Link

Estimated Carbon Footprint

Annual CO₂
15,390 t

tonnes / year

Lifetime CO₂
1.2M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

3,346
cars / year
2,052
homes / year
699,526
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Ana-Sira is a notable power generation facility located in Norway, ranked 64th among the nation’s 440 plants with a capacity of 183 MW. This hydroelectric plant holds a significant position in a country where hydro power dominates the energy landscape, accounting for a staggering 39,683 MW of total capacity. With its current capacity, Ana-Sira represents approximately 0.46% of Norway’s total energy output, underscoring its essential contribution to the national grid. The facility is surrounded by an impressive array of nearby plants, including the Tonstad Hydro Plant at 1130 MW, Duge Hydro at 200 MW, and the Tonstad Wind Farm, which adds 208.3 MW to the mix. These plants form a robust energy cluster that not only provides substantial electricity generation but also enhances grid reliability and stability. The extensive use of hydroelectric power in Norway, which leads the world in renewable energy utilization, positions Ana-Sira as a vital component of a system that is both environmentally sustainable and reliable. As a hydroelectric facility, it benefits from the country’s abundant water resources and favorable geography, ensuring efficient energy production year-round. The operational history of Ana-Sira enriches its profile, having been commissioned to serve the growing energy needs of the region. Given Norway’s ambitious climate goals and the global shift towards cleaner energy, Ana-Sira’s role in the energy transition is crucial. As more focus is placed on renewable sources, hydroelectric plants like Ana-Sira will be at the forefront, contributing to a low-carbon future. Furthermore, as Norway progresses towards its commitment to sustainability, Ana-Sira is poised to continue playing a central role, not only in meeting domestic energy demand but also in supporting broader European energy initiatives aimed at reducing reliance on fossil fuels.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.