Antônio Brennand (Antiga Alto Jauru) is a 22 MW hydro power plant located in Brazil. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 22 MW
- Commissioned
- 2002
- Status
- Operational
- Owner
- Eletrobras
- Country
- Brazil
- Coordinates
- -15.047, -58.752
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
Antônio Brennand (Antiga Alto Jauru) is a 21.96 MW hydro power plant in Brazil, commissioned in 2002.
Ranked #288 of 720 hydro plants in Brazil. Its 21.96 MW represents 0.01% of Brazil’s 180,234 MW total hydro capacity. The largest hydro plant in Brazil is Itaipu Dam at 14,000 MW, making Antônio Brennand 637.7 times smaller.
Nearby plants within 50 km include Guaporé (124.2 MW, Hydro), UHE Jauru (122 MW, Hydro), and Jauru (121.5 MW, Hydro). The facility is located in the Mato Grosso region, approximately 200 km from Cuiabá.